LEED v5 BD+C/ID+C: Indoor Environmental Quality public commentsLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Nadav Malin on Apr 2, 2024, 5:06 pm
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Indoor Environmental Quality section on this forum. You can either reply to this thread or use the "Post a Question... Last reply: Lyle Axelarris, Apr 3, 2024, 7:37 pm |
|
First public comment draft of LEED v5 BD+C/ID+C: Integrative ProcessLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Nadav Malin on Apr 2, 2024, 2:08 pmShare your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments section on this forum. You can either reply to this thread or use the... Last reply: Emmanuel Pauwels, Apr 15, 2024, 3:31 pm |
|
LEED v5 O&M Existing Buildings public commentsLEED v5 O&M Existing Buildings Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:57 pmShare your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a... Last reply: James Lee, Apr 16, 2024, 8:59 pm |
|
First public comment draft of LEED v5 BD+C/ID+C: Energy and AtmosphereLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:52 pmShare your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum. You can either reply to this thread or use the "Post a Question/Comment"... Last reply: Ed Simpson, Apr 4, 2024, 11:24 am |
|
First public comment draft of LEED v5 BD+C/ID+C: Overall and AppendixLEED v5 BD+C/ID+C: Overall and Appendix Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:39 pmShare your comments on the first public comment draft of LEED v5 BD+C/ID+C: Overall and Appendix section on this forum. You can either reply to this thread or use the "Post a Question/Comment"... Last reply: Mark Terpstra, Apr 12, 2024, 8:33 pm |
|
Certification of a high-voltage electrical substationLEED v4.1 Discussion Forumposted by LEED User95 on Apr 2, 2024, 12:16 pm
Hello, Is the construction of a high-voltage electrical substation certifiable ? If so, under which category of building would it be classified in the reference framework ? ...Last reply: Nadav Malin, Apr 2, 2024, 4:46 pm |
|
Differences between Baseline and Proposed energy modelCI-v4 EAp2: Minimum Energy Performanceposted by Irina Lugo on Apr 2, 2024, 9:57 am
Hi everyone, sorry if this is a bit obvious, it is my first time working with this type of LEED certification. I am working on a refurbishment project for an office space, I have made my energy... Last reply: Marcus Sheffer, Apr 5, 2024, 8:48 am |
|
can I get point with double contraction??NC-v4 EAc4: Demand responseposted by Kyu-min Lee on Mar 30, 2024, 11:54 pm
Hi, While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as... Last reply: Kyu-min Lee, Apr 15, 2024, 1:40 pm |
|
Deep Soil mixing activityNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Summer Gorder on Mar 29, 2024, 2:46 pm
Does deep soil mixing activity fall under 31.60 Foundations? |
|
Parking spacesNC-v4 LTc7: Reduced parking footprintposted by David O'Connell on Mar 28, 2024, 5:13 am
Hi All, Working on a project that is part of larger campus it is only a single building that is being certified. There is a seperate parking lot where there is no plan on designing new... Last reply: Gioia Connell, Mar 28, 2024, 3:01 pm |