What is WEp1-1, plumbing fixture and fitting schedule?

CI-2009 WEp1: Water Use Reduction
posted by Diana Hill on Dec 28, 2012, 2:02 pm

In the summary of the online table it says,
Upload WEp1-1. "Provide the plumbing fixture and fitting schedule for the project highlighting flush and flowrates for all applicable plumbing...

Last reply: Carlie Bullock-Jones, Jan 3, 2013, 12:04 pm

FTE

CI-2009 WEp1: Water Use Reduction
posted by Kasandra Martin on Dec 11, 2012, 3:15 pm

How do I know what my...

Last reply: Kasandra Martin, Dec 13, 2012, 12:50 pm

Toilet Scope

CI-2009 WEp1: Water Use Reduction
posted by sompoche sirichote on Sep 13, 2012, 2:25 am

If our client who own the entire building would like to do the fitout for only 1 floor. The toilet is out of fitout scope.
The client would like to get LEED CI certified.
Is the...

Last reply: Carlie Bullock-Jones, Sep 13, 2012, 9:46 am

Water Guidance Rationale for "Both-Outside Fixtures Included"

CI-2009 WEp1: Water Use Reduction
posted by Michelle Rosenberger on Jun 7, 2012, 6:45 pm

If you have fixtures both within and outside your space to serve tenants and you are pursuing WEcr1, what is the documentation rationale for not including the "outside" fixtures in WEpr1 and then...

Last reply: Michelle Rosenberger, Sep 6, 2012, 1:12 pm

Documenting a Non 50/50 Gender Split

CI-2009 WEp1: Water Use Reduction
posted by Michelle Rosenberger on Mar 20, 2012, 2:57 pm

I see discussion about this for NC projects indicating that basically no documentation will suffice to demonstrate compliance with a non 50/50 gender split unless it addresses "the lifespan of...

Last reply: Michelle Rosenberger, Sep 6, 2012, 11:58 am

Private Lav Faucets- Baseline vs. Metered Design

CI-2009 WEp1: Water Use Reduction
posted by Vincent Pieri on Jun 10, 2012, 8:21 pm

We are working on a single floor, single tenant project with several fixture group assignments. The floor public fixtures are treated as public fixtures, but there are a number of exam rooms...

Last reply: Carlie Bullock-Jones, Sep 5, 2012, 6:46 pm

no change of flow fixtures

CI-2009 WEp1: Water Use Reduction
posted by Adam Targowski on Jul 18, 2012, 11:42 am

We have a project that consists of an office space with toilets however the folw fixtures are not going to be changed. Is this project exempt from earning this prerequisite?

Last reply: Tristan Roberts, Aug 30, 2012, 8:03 pm

Ritual handwash/foot wash sink

CI-2009 WEp1: Water Use Reduction
posted by Jonathan Weiss on Aug 28, 2012, 3:01 pm

I am working on a project with a ritual hand wash / foot wash (ablution) fixture as part of the program. We have a fixture that has been selected by the owner, and I cannot find any alternates...

Last reply: Jonathan Weiss, Aug 28, 2012, 3:29 pm

LEED-CI WEp1 & WEc1

CI-2009 WEp1: Water Use Reduction
posted by Patti Gunderson on May 23, 2012, 9:36 am

We happen to have received comments back from two different LEED-CI projects within a week of each other and they appear to include contrary interpretations on the issue of whether or not to...

Last reply: Luis Miguel Diazgranados, Aug 8, 2012, 3:46 pm

WEc3 Baseline- or Existing Efficiency?

CI-2009 WEp1: Water Use Reduction
posted by MacKenzie King on Jul 26, 2012, 7:52 pm

We're looking to pursue this credit, but are a bit confused how the baseline is calculated for an interior renovation project with a portion of new construction. Our mechanical engineer seems to...

Last reply: Tristan Roberts, Jul 26, 2012, 10:09 pm