Log in
Forum » NC-2009 EAc1
Loading...
Topic

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1: Optimize Energy Performance
posted by Reniel Barroso on Aug 11, 2016, 1:54 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5530 thumbs up August 31, 2016- 11:45 am Answered in the EAp2 forum. Log in or register to post comments ...

Last reply: Marcus Sheffer, Aug 31, 2016, 11:45 am

Mandatory 18% energy saving after April 2016

NC-2009 EAc1: Optimize Energy Performance
posted by Indochine Engineering VN on Aug 9, 2016, 10:03 am

Hi, I just read requirement of EAc1 on USGBC web page, is it true that all LEED New Construction projects registered after 8 April 2016 have to reach 18% - 4 points at minimum. So projects have...

Last reply: Marcus Sheffer, Aug 16, 2016, 11:16 am

Data center Lighting- Building area method

NC-2009 EAc1: Optimize Energy Performance
posted by SAMY Chamy on Aug 10, 2016, 8:37 am

Dear All:-

we are doing LEED NC project for data center which one is correct base case...

Last reply: Marcus Sheffer, Aug 11, 2016, 10:17 am

"DES Energy Cost" Thread Follow-Up

NC-2009 EAc1: Optimize Energy Performance
posted by Joseph Chappell on Aug 9, 2016, 3:47 pm

In a previous post titled "...

Last reply: Marcus Sheffer, Aug 11, 2016, 10:04 am

LEED 2009 NC- Warehousemodelling HVAC syetm in IES

NC-2009 EAc1: Optimize Energy Performance
posted by Alice chen on Jun 13, 2016, 9:35 am

Hi All,

I do need help in the energy modelling for a warehouse project. Thanks in advance!

This project consists of 200,000sf of warehouse with 5,000sf office space. The warehouse...

Last reply: Marcus Sheffer, Aug 11, 2016, 9:46 am

ASHRAE Baseline Constructions- with two building types

NC-2009 EAc1: Optimize Energy Performance
posted by Alice chen on Jul 22, 2016, 9:32 am

Cory Duggin Energy Project Engineer TLC Engineering for Architecture LEEDuser Premium Member 40 thumbs up July 22, 2016- 10:07 am I would suggest you post this to the IESVE forum on their website or to the BLDG-SIM (bldg-sim@lists.onebuilding.org) since this is more of a software and modeling question than a LEED one. Log in or register to post comments ...

Last reply: Cory Duggin, Jul 22, 2016, 10:07 am

Renewable energy in EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by VICTOR MORENO on Jul 21, 2016, 4:22 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5530 thumbs up July 21, 2016- 4:48 pm I'll answer in the EAp2 forum. No need to post the same question in multiple forums. Log in or register to post comments ...

Last reply: Marcus Sheffer, Jul 21, 2016, 4:48 pm

ASHRAE Baseline Constructions

NC-2009 EAc1: Optimize Energy Performance
posted by Alice chen on Jul 18, 2016, 7:18 am

Hi All,

I am working on a large warehouse building with a small office building on the site.

The warehouse is heated only, so I suppose that is semiheated space, is that right?...

Last reply: Alice chen, Jul 19, 2016, 12:43 pm

ASHRAE 90.1 Table 6.5.3.1.1A VS Table G3.1.2.9

NC-2009 EAc1: Optimize Energy Performance
posted by Ameet AA on Jun 29, 2016, 11:02 pm

Hello,

I'm confused with the two tables. In Table 6.5.3.1.1A option 2, the limit is fan system input power; whereas in Table G3.1.2.9, the limit given by the same equation is brake horse...

Last reply: Ameet AA, Jul 10, 2016, 11:29 pm

How to get the benefit of automatic shading control device

NC-2009 EAc1: Optimize Energy Performance
posted by Yusuf Turab on Jun 27, 2016, 3:24 am

We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to...

Last reply: Marcus Sheffer, Jul 1, 2016, 10:14 am