Log in
Forum » Canada
Topic

MR Credit: "Permanently installed products" vs "Permanently installed BUILDING products"

LEED v4.1 Discussion Forum
posted by Ryan Demchuk on Jan 9, 2020, 2:15 pm

My question is regarding the classification of "permanently installed products" vs. "permanently installed BUILDING products".

For example, the MR Credit: Building Product Disclosure and...

LEEDv4.1 Acoustic- Can residential projects no longer achieve this credit?

LEED v4.1 Discussion Forum
posted by Sophie Kerr on Jan 8, 2020, 5:11 pm

I noticed LEED v4.1 removes mention of residence and residential. Table 1 removes all 'residence' reference and table 2 removes 'apartment and condominium'. Can residential projects no longer...

Last reply: Sophie Kerr, Jan 8, 2020, 5:18 pm

Anti-Ligature fixtures

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on May 25, 2018, 12:59 pm

The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures? Our client requires...

Last reply: Stewart Whitcomb, Jan 8, 2020, 5:07 pm

Points for ACP and as Pilot credit

Pilot-Credits MRpc102: Legal Wood
posted by Keith Robertson on Dec 20, 2016, 12:47 pm

We have registered our Canadian project for the Legal...

Last reply: Michelle Robinson Schwarting, Dec 19, 2019, 4:18 am

Documentation Required for IP Credit

Schools-NC-v4 IPc1: Integrative process
posted by Cora Kenrick on Mar 7, 2018, 5:37 pm

Hi Fellow LEED Users,

Has anyone submitted this credit yet and what documentation is required.

I'm new to LEED and this credit.

So hints, tips and advice...

Last reply: Emily Purcell, Dec 11, 2019, 9:58 am

Modelling Hospital Addition

Healthcare-v4.1 EAc2: Optimize Energy Performance
posted by Eddie Roach on Nov 20, 2019, 3:10 pm

Hello all,

I am currently working to create an energy model for an addition to be made to a hospital and am unsure how to go about modelling the heating system. New air handling...

Structural composite wood and moisture resistant adhesives- compliance and supporting documentation

NC-v4.1 EQc2: Low-emitting materials
posted by Esther Ma on Nov 12, 2019, 11:34 am

Hello LEED User community,

Does anyone have any information regarding how to show compliance with and document the "moisture resistant adhesives meeting...

LEED BD+C or LEED CS or LEED CI?

LEED Rating System Selection
posted by Alara Matsyk on Oct 31, 2019, 5:55 pm

Hi All,

We have a LEEDv4 new contraction project that will be 50% fit up, 50% empty/core&shell. All same owner, 2nd floor will just be left vacant until the owner decided to develop....

Last reply: Alara Matsyk, Nov 1, 2019, 1:49 pm

Option 2- Is there still a minimum sample area requirement?

NC-v4 EQc4: Indoor air quality assessment
posted by Daniel Smith on Oct 9, 2018, 4:31 pm

I am quoting to provide Option 2...

Last reply: Barbara Beckmann, Oct 31, 2019, 5:47 am

Reduced Parking Footprint Opt 4- Unbundling Parking

NC-v4.1 LTc7: Reduced parking footprint
posted by Rebecca Mann on Oct 27, 2019, 10:46 am

New options were introduced in v4.1 for LT Reduced Parking Footprint. Parking provided for our project slightly exceeds the bylaw requirement with 9 stalls required, and 10 provided including 1...