Log in
Forum » Spain
Loading...
Topic

Selling renewable energy

CI-v4 EAc4: Renewable energy production
posted by Borja Sánchez on Jan 25, 2018, 8:15 am

Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building. This electricity it’s not sold to a specific user...

Last reply: Marcus Sheffer, Jan 25, 2018, 12:38 pm

NC-v4 SSc2- Site development- protect or restore habitat

NC-v4 SSc2: Site development - protect or restore habitat
posted by Mar Mulero on Jan 10, 2018, 11:03 am

Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a...

Last reply: emily reese moody, Jan 11, 2018, 6:54 pm

Preferred parking spaces in a residential building

NC-v4 LTc8: Green vehicles
posted by Francisco Borja Lopez Calle on Oct 24, 2017, 10:36 am

Hi,

I'm working on a projet with residential use, so each flat will have an assigned parking space. Discounted parking rates is not an option since each flat has a predefined number of...

Preferred parking spaces in a residential building

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Francisco Borja Lopez Calle on Oct 24, 2017, 10:30 am

Hi,

I'm working on a projet with residential use, so each flat will have an assigned parking space. Discounted parking rates is not an option since each flat has a predefined number of...

FSC x PFEC

NC-2009 MRc7: Certified Wood
posted by Karyn Rodrigues on May 11, 2017, 8:25 am

I am working for a project in Barcelona which is pursuing LEEDv2009 certification. We are facing a huge difficulty to find suppliers for the...

Last reply: PAWAN DAHIWAL, Oct 11, 2017, 12:58 am

LEED BD+C: Retail or LEED ID+C: Retail?

LEED Rating System Selection
posted by Borja Sánchez on Sep 27, 2017, 4:41 am

Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on.

The project consists in a major renovation (it includes changes on façades,...

Last reply: Borja Sánchez, Oct 2, 2017, 5:07 am

Multi-occupant Spaces Vs. Patients rooms

Healthcare-v2009 IEQc6.1: Controllability of systems - lighting
posted by VICTOR MORENO on Aug 9, 2016, 11:36 am

Hi,

I´m managed a Healthcare buildings.

The reviewer advice me that workstation and share multi-occupant spaces must be reported consistently among IEQc6.1 and IEQc6.2 credits....

Last reply: Susan Walter, Aug 29, 2017, 4:55 pm

pursuing thermal confort in a museum/gallery

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Angel Vega on Jan 25, 2017, 1:07 pm

Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the...

Last reply: Lauren Sparandara, Aug 28, 2017, 2:45 pm

Soil contaminated (by oil/diesel)

CS-2009 SSc3: Brownfield Redevelopment
posted by Julia Otero on Jan 23, 2017, 9:21 am

We are working in a project where a tank containing 6,000 lt of fuel has been detected in the soil. This tank is confined within a concrete...

Last reply: Tristan Roberts, Aug 26, 2017, 7:10 pm

Alarms with CO2 sensors

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Angel Guerra on Aug 7, 2017, 3:42 am

hi,
We have a project with non-densely spaces. The non-densely space will have CO2 sensor....

Last reply: Andrew Mitchell, P.E., Aug 7, 2017, 11:17 am