Log in
Forum » United Arab Emirates
Loading...
Topic

PV panels on Roof

CS-v4 SSc5: Heat Island Reduction
posted by Andrea Tirao on Jul 6, 2017, 3:12 am

Hi,
Our project has parking on basement, GF+1F office spaces, then roof is covered almost entirely of PV panels. Having the above conditions, we are initially assessing if we can either...

Last reply: Summer Minchew, Jul 12, 2017, 10:04 am

LEED Group C&S- Applicable Cooling source in Propose case

CS-v4 EAp2: Minimum Energy Performance
posted by Ashraf Ali Khan Khan on Jun 8, 2017, 8:13 am

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

For LEED Group...

Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am

Applicable Cooling source in Propose case- LEED Group- v4 C&S

CS-2009 EAp2: Minimum Energy Performance
posted by Ashraf Ali Khan Khan on Jun 8, 2017, 7:29 am

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

For LEED Group...

Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am

Energy Star Protfolio Manager

EBOM-v4 EAp2: Minimum Energy Performance
posted by Sarfaraj Khan on Apr 11, 2017, 7:13 am

Hi

Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager

Regards

Last reply: Charalampos Giannikopoulos, Apr 12, 2017, 3:34 pm

Arc Platform

Performance Period
posted by Sarfaraj Khan on Apr 11, 2017, 8:45 am

Hi
Did any one know any guideline or book from USGBC to complete the project documents for LEED V4 O&M in the Arc Platform if the project is going for performance pathway

Last reply: Batya Metalitz, Apr 12, 2017, 10:45 am

Leed 2009 NC-District cooling path one

NC-2009 EAc1: Optimize Energy Performance
posted by Mark JIN on Mar 20, 2017, 10:53 pm

Dear Friends,

I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water. However the DCP supplier is not willing to share any...

Last reply: Marcus Sheffer, Mar 24, 2017, 9:48 am

Baseline Pumping Power

NC-2009 EAp2: Minimum Energy Performance
posted by Ahmed Labeeb on Feb 9, 2017, 8:24 am

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mention the effect of pumps' head. the majority of projects that I am working on them, the proposed pumping...

Last reply: Marcus Sheffer, Feb 10, 2017, 2:22 pm

Baseline Pumping Power

NC-2009 EAp2: Minimum Energy Performance
posted by Ahmed Labeeb on Feb 9, 2017, 7:52 am

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head. the majority of projects that I am working on them, the proposed pumping...

Last reply: Ahmed Labeeb, Feb 9, 2017, 8:06 am

Baseline Pumping Power

NC-2009 EAp2: Minimum Energy Performance
posted by Ahmed Labeeb on Feb 9, 2017, 7:54 am

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head. the majority of projects that I am working on them, the proposed pumping...

Last reply: Ahmed Labeeb, Feb 9, 2017, 8:03 am

WHAT IS DIFFERENCE NFRC 100 AND NFRC 200

NC-2009 EAp2: Minimum Energy Performance
posted by Ramkrishna kashyap Kashyap on Jan 5, 2017, 1:58 am

ONLY NON-RESIDENCE ALUMINUM FRAME

Last reply: Marcus Sheffer, Jan 5, 2017, 9:55 am