Log in
Forum » Middle East
Loading...
Topic

Backup generators

Pilot-Credits EApc66: Community contaminant prevention - airborne releases
posted by Malek Abualhaj on Jul 11, 2018, 4:42 am

Do backup generators fall under this requirement?

Last reply: David Eldridge, Jul 11, 2018, 4:16 pm

LEED Online Form / Energy Star Target Finder

CI-v4 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on Jun 6, 2018, 3:23 am

Hi,

The below-mentioned contents were copied from LEED Online form. Could you explain, how the energy star values should be compared with Energy Model?

Target Finder...

Last reply: Marcus Sheffer, Jul 6, 2018, 11:37 am

Bussiness Transport serving the users of the project.

CS-v4 LTc5: Access to quality transit
posted by Víctor Ramírez Orozco on Jul 3, 2018, 10:50 am

We are assessing a project that is in an industrial park far away from the city. The project is served by a business transportation company which pick up the employees in several strategic points...

Division of Building in a Core and Shell Project

CS-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jul 3, 2018, 4:27 am

Dear all,

We have a project that consists of private offices (belong to the owner), rental offices as well as a mall and restaurant spaces. I wonder whether we can divide the building in a...

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6: Light Pollution Reduction
posted by Candace Cohen on Jun 17, 2018, 7:40 am

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site. Could someone...

Last reply: Candace Cohen, Jun 26, 2018, 5:23 am

Timeline issues with "Recycle or Reuse Construction and Demolition Waste"

ND-Plan-v4 GIBc16: Solid waste management
posted by Ilan Yahav on Jun 25, 2018, 10:06 am

How can we proceed with this credit in a LEED ND-plan, if there is a requirement to track diverted waste?

The infrastructure works in this project will only begin after the plan phase is...

Last reply: Eliot Allen, Jun 25, 2018, 11:59 am

LEED Project boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Neetika Parmar on Feb 9, 2017, 12:05 am

Our Project is an Office cum warehouse. The area distribution is:

Office- air conditioned with an area of 4 000 sq.ft (G+1)
Warehouse- non air conditioned with an area of 84 400 sq...

Last reply: Nadav Malin, Jun 12, 2018, 1:37 pm

Previously developed and graded area by municipality- How long before construction?

NC-2009 SSc1: Site Selection
posted by Ilan Yahav on Jun 11, 2018, 5:58 am

I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006. Is there a time limit for sited...

LEED v4 EBOM- Commissioning

EBOM-v4 EAc2: Existing building commissioning - implementation
posted by Aber Alvi on Mar 22, 2018, 1:04 am

A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the last one...

Last reply: Trista Little, May 24, 2018, 8:26 pm

Hoarding dimensions

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Ahmed Labeeb on Mar 5, 2018, 8:07 am

Dear All,

Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?

As the Site Engineer is asking us (Consultant), I did...

Last reply: Trista Little, May 16, 2018, 9:52 pm