VOC content- all or nothing?

NC-v4.1 EQc2: Low-emitting materials
posted by Tommy Linstroth on Jul 11, 2019, 10:00 am

that do not exceed the limit. But it would be nice to confirm with GBCI in the event a non-compliant product is used. I'll check with my contacts at GBCI and post the correspondence to the forum...

Last reply: David Hubka, Jul 11, 2019, 3:04 pm

DES allocation Calculator

NC-2009 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Jul 11, 2019, 12:21 pm

Dear All,

I have a question regarding LEED V2009 BD+C New Construction and Major Renovation, EA P2 - Minimum Energy Performance.

We are working on a...

Lighting group control for On/Off/Mid Lighting control requirement

NC-v4 EQc6: Interior lighting
posted by Thomas Tan on Jul 10, 2019, 12:08 am

Dear LEEDusers,

We have a project with a manufacturing space to pursue the Interior lighting control credit. Dimmers for task lights is not acceptable as safety issue.

To meet the 3...

Last reply: David Hubka, Jul 11, 2019, 11:26 am

Inclusive Design Pilot Credit

Pilot-Credits INpc125: Inclusive Design
posted by Karen Mahrous on Jun 20, 2019, 4:16 pm

Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners....

Last reply: Emily Purcell, Jul 10, 2019, 6:49 pm

Missing inspection documentation

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Sean Adams on Apr 2, 2019, 8:36 am

Project has always been trying to earn LEED Silver and...

Last reply: Vanessa Nelson, Jul 10, 2019, 5:21 pm

PV Panles over compliant white membrane with a high SRI

CS-2009 SSc7.2: Heat island effect - roof
posted by Guillermo Hernandez Espinoza on Jul 4, 2019, 6:13 pm

Hi Everyone.

I have an array of pv panels that will be installed over a compliant white membrane with a high...

Last reply: David Posada, Jul 10, 2019, 5:04 pm

Pre development conditions for v4

NC-v4 SSc4: Rainwater management
posted by Gabriela Mesquita on Jul 5, 2019, 11:46 am

Good morning,

In the New Construction v.4 Guide, the calculation of stormwater storage volume for runoff control, does not mention the conditions before the project. I understand that the...

Last reply: David Posada, Jul 10, 2019, 5:00 pm

Exhaust not interlocked with HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge López de Obeso on Nov 14, 2018, 11:38 am

Hello, we have this residential project were the HVAC system is as follows:

Baseline: System 2 - PTHP

Proposed: Mini Split System

The thing here is that, as known,...

Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm

Construction Activity pollution prevention inspections

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Irene Carreno on Aug 17, 2017, 1:27 pm

Hello.
I am working in a project that has the Erosion and control plan following the...

Last reply: Jose Gonzalez, Jul 10, 2019, 4:18 pm

Wet Applied Products Meeting Option 1- Volume Requirement?

NC-v4 EQc2: Low emitting materials
posted by Summer Gorder on Jul 10, 2019, 1:13 pm

For Wet Applied Products that meet IEQ credit 2, option 1: do you still need to provide the volume of the product used on the project, or is that just for option 2, Budget Calculation? Thanks!...