Log in
Forum
Loading...
Topic

5 Regional Priority Credits

NC-v4 RPc1: Regional Priority
posted by Nathan Gauthier on Oct 24, 2018, 11:12 am

I was checking the RP credits for LEED v4 NC in Cambridge today and there are only 5 listed (not 6). Boston is the same way. My understanding and past experience is there are always supposed to...

Last reply: Tristan Roberts, Aug 14, 2019, 4:59 pm

Default values used in calculator

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Jasmine A on Aug 13, 2019, 4:52 pm

Are refrigerant GWPr and equipment life (years) typically shown on cutsheets, or are default values sufficient for this credit?

The closest I've seen is a calculator from Trane:...

Last reply: David Hubka, Aug 14, 2019, 4:17 pm

VLT x WFR TOO HIGH?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Elissa Wu on Aug 14, 2019, 4:05 pm

Hello

I am inputting a regularly occupied space in the calculator via the sidelighting prescriptive method. The Zone Floor Area is 148 SF (which is the nearly the size of the entire space...

MRc2

NC-2009 MRc2: Construction Waste Management
posted by Victoria Rios Esteve on Aug 14, 2019, 3:38 pm

Hi! We have a building in the process of certification which changed its initial contractor to another company. So, we were planning to add an adjunct to our Construction and Waste Management...

Last reply: debra a. lombard, Aug 14, 2019, 3:49 pm

LEED 2009 Credit SSc2 Development Density and Community Connectivity

NC-2009 SSc2: Development Density & Community Connectivity
posted by Andrew Buck on Aug 13, 2019, 10:22 am

Hello, we are working on a Hotel Project in Chicago, where we had 10 basic services within a 1/2 mile radius, but one of the services (Convenience Market) has closed in the last year (during...

Last reply: Allison Smith, Aug 14, 2019, 1:12 pm

Exemplary Threshold

NC-v4 LTc5: Access to quality transit
posted by Jane Bills on Aug 13, 2019, 9:22 pm

I have a Core & Shell project with the following:

RAIL:

249 Weekday          117 Weekend

BUS:

204 Weekday          117 Weekend

We used "Multiple Transit" to...

Percentage Improvement using GHG emission metric

NC-v4.1 EAc2: Optimize Energy Performance
posted by Pan Pan on Aug 14, 2019, 3:18 am

Hi,

How is the calculation for...

Compliance to ASHRAE 90.1-2010- Dimming Lights

CS-v4 EAp2: Minimum Energy Performance
posted by Summer on Aug 14, 2019, 1:03 am

I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking. The parking slots are not solely for the office tower (office towers are the ones that...

Compliance to ASHRAE 90.1-2010- Dimming Lights

CS-v4 LTc7: Reduced parking footprint
posted by Summer on Aug 14, 2019, 12:57 am

I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking. The parking slots are not solely for the office tower (office towers are the ones that...

Option A: Luminance, UGR is working?

NC-v4 EQc6: Interior lighting
posted by Marius Dabonneville on Nov 13, 2017, 5:43 am

Hi everyone, 

We're actually working on a project in France. Lighting system suppliers only give us the Photometric curv in cd/klm and no in cd/m². The EN 12464 defines luminance with UGR...

Last reply: Regina Ng, Aug 13, 2019, 11:19 pm