Topic

Inconsistent expectations

NC-v4 IPc1: Integrative process
posted by Martha Norbeck on Aug 8, 2019, 11:15 am

To the USGBC staff who I know read these comments, please issue consistent guidance for how this credit will be evaluated. I've submitted twice for this credit. The first submission was accepted...

Last reply: Faun Carlson, Aug 12, 2019, 12:20 pm

How do credits get removed? Central vacuums mystery

LEED v4.1 Discussion Forum
posted by Nathan Barlow on Aug 7, 2019, 9:25 am

Central vacuums existed in the "Contaminant Control" category in LEED Homes 2008: https://www...

Last reply: Tristan Roberts, Aug 12, 2019, 12:13 pm

certification of an airprt's Terminal

LEED v4.1 Discussion Forum
posted by Evangelia Mertziou on Aug 12, 2019, 5:28 am

Is it achievable the LT Credit "Surrounding Density and Diverse Uses", Option2 for the certification of an airport's Terminal?

Could the diverse uses (Restaurant, Cafe, Bank, Hair Care,...

Is it safe to infer 'No formal Systems Manual' in v4?

CI-v4 EAc1: Enhanced Commissioning
posted by Larry Lister on Feb 12, 2019, 6:40 pm

I've read a few opinions and haven't found any official Interpretation (yet?) to better define the discrepancies in language regarding required...

Last reply: Scott Bowman, Aug 11, 2019, 6:32 pm

USGBC approved equivalent for ASHRAE standards

CI-v4 EAp1: Fundamental commissioning and verification
posted by Alexander Spilger on Feb 4, 2019, 6:16 am

Hi,

I am working on a LEED project within the UK, and I am trying to understand the alternative paths to ASHRAE Guideline 0-2013, ASHRAE Guideline 1.1–2007 for HVAC&R System, ASHRAE 90...

Last reply: Scott Bowman, Aug 11, 2019, 6:30 pm

Eligibility of EMS for MBCx

NC-v4 EAc1: Enhanced Commissioning
posted by Gustavo De las Heras Izquierdo on Mar 3, 2019, 5:12 pm

Hallo,

Does anyone know if an EMS (Energy Management System) that is composed of energy meters to measure and track energy makes a project eligible to pursue Monitoring Based Commissioning...

Last reply: Scott Bowman, Aug 11, 2019, 6:27 pm

Commissioning Documentation for 7 separate towers sharing a common ground floor & podium level with shared/mixed MEP Systems

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Joshua ADY on Mar 10, 2019, 6:24 am

We are working as an independent...

Last reply: Scott Bowman, Aug 11, 2019, 6:23 pm

Phased Cx for a phased project

NC-v4 EAp1: Fundamental commissioning and verification
posted by Peter Doo on Apr 15, 2019, 4:55 pm

We are working on a comprehensive renovation and addition of an Art Center at an independent high school. The project will be phased; existing system upgrades and building renovation in phase 1...

Last reply: Scott Bowman, Aug 11, 2019, 6:13 pm

Envelope CxA within the engineering company part of design team?

NC-v4 EAc1: Enhanced Commissioning
posted by Erika Roy on Apr 23, 2019, 1:59 pm

Hello,

We want to use a building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:09 pm

Envelope Design Review for LEED V4 Commissioning under Fundamental Cx

NC-v4 EAp1: Fundamental commissioning and verification
posted by Rohit Upadhyay on Apr 24, 2019, 7:55 pm

Hi Everyone,

Can someone clarify what is the extent of envelope design review by a Commissioning Authority (...

Last reply: Scott Bowman, Aug 11, 2019, 6:06 pm