posted by Angela A. Moore on Dec 9, 2019, 3:06 pm

Reporting...

Last reply: Allen Cornett, Jan 14, 2020, 5:06 pm

CDPH method 1.2 for LEED V4

NC-v4 EQc2: Low emitting materials
posted by Omar ElRawy on Jan 14, 2020, 4:56 pm

Dears,

I have some products which are compliant with CDPH method 1.1, and others compliant with CDPH method 1.2. I'm aware that LEED V4.1 allows for CDPH method 1.2, but I don't prefer to...

Exterior slab with radiant heating

Healthcare-v4 EAp2: Minimum Energy Performance
posted by Priscillia Champagne on Jan 14, 2020, 2:45 pm

I am working on a project in Quebec (where there is a lot of snow) and the client has requested a radiant heating system for an exterior concrete slab that links a ramp to an ambulance garage (to...

Last reply: Marcus Sheffer, Jan 14, 2020, 4:37 pm

district energy- does the plant need to follow same ASHRAE standard?

NC-v4 EAp2: Minimum Energy Performance
posted by Craig Flandermeyer on Jan 9, 2020, 10:34 am

Project is utilizing energy from a central plant, the team is attempting to decide between using the purchased energy approach vs. modeling the plant.  The project is LEED v4 and follows ASHRAE...

Last reply: Marcus Sheffer, Jan 14, 2020, 4:27 pm

Delegated Design of Irrigation with Split Review

NC-v4 WEp1: Outdoor water use reduction
posted by Leanne Conrad on Jan 14, 2020, 1:06 pm

We have delegated design of the irrigation system to the contractor but are pursuing the split review process. If the irrigation design is not completed until construction, when I submit the...

Last reply: Deborah Lucking, Jan 14, 2020, 4:08 pm

OLD VOC CONTENT TEST CERTIFICATE

CI-v4 EQc2: Low emitting materials
posted by sara m on Dec 26, 2019, 2:05 am

CAN WE USE AN OLD...

Last reply: Allen Cornett, Jan 14, 2020, 3:06 pm

Still able to have commingled waste being recycle?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Victoria Rios Esteve on Dec 30, 2019, 3:58 pm

Hi everyone!

Im starting a new project that will certify as NC Major Renovation in LEED v4. So, we were analysing this credit´s option 1 (either path 1 or 2). Due to our location, we are...

Last reply: Allen Cornett, Jan 14, 2020, 2:45 pm

Gross Floor Area: Areas to exclude

CS-2009 PIf2: Project Summary Details
posted by Silvia Ruiz on Jan 24, 2018, 6:57 pm

Hello

I'm calculating the...

Last reply: Summer Minchew, Jan 14, 2020, 2:01 pm

"Open to update" an already awarded credit

CS-2009 WEp1: Water Use Reduction
posted by Victoria Rios Esteve on Jan 14, 2020, 1:34 pm

Hi everyone!

We have recently received the design final review and are preparing the construction submittal for a v2009 Core and Shell project. On the design final review, WEp1 has been...

Compliant EPR Programs

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Amanda Tullos on Jan 9, 2020, 1:22 pm

Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#...