Lighting Control in blood draw spaces

Healthcare-v4 EQc6: Interior lighting
posted by Heather Belsey on Mar 11, 2024, 3:56 pm

For the lighting credit you need to have individual controls at 90% of patient positions.  LEED defines patient positions as:

A patient bed, infusion chair, recovery...

Green walls

NC-v4 SSc3: Open space
posted by Santiago Avila on Mar 11, 2024, 10:44 am

Hello everybody,

I would like to confirm if green walls counts as green area for open spaces, clarly without any artificial/fake plants. 

ACP

Homes-v4 EQp4: Radon-resistant construction
posted by Gustavo De las Heras Izquierdo on Mar 8, 2018, 12:39 pm

Hallo,

Many countries do not have mapped radon levels as accurately as EPA requires. Can countries marked in orange and green in the following study be considered as "out of EPA zone 1"?...

Last reply: Van Jomel Garcia, Mar 11, 2024, 3:24 am

Enhanced Refrigerant Management Query

EBOM-v4 EAc8: Enhanced Refrigerant Management
posted by padma priya on Mar 7, 2024, 4:16 am

We have a VAM Chiller, and we indicated "none" as the refrigerant type because in VAM chillers, water serves as the refrigerant, resulting in zero OWP and...

Last reply: Dave Hubka, Mar 9, 2024, 11:42 pm

Commissioning near end of construction

NC-v4 EAp1: Fundamental commissioning and verification
posted by Nadia Azzam on Mar 7, 2024, 10:37 am

We have been handed over a project aiming for LEED Gold that was delayed due to COVID and previously managed by a different LEED admin who has since left the company. After reviewing the...

Last reply: Dave Hubka, Mar 8, 2024, 9:33 am

BIFMA e3 equivalents

CI-v4 EQc2: Low-emitting materials
posted by Samantha Allen on Jul 13, 2023, 6:35 am

Does anyone know of any equivalents for BIFMA e3 or level that are available in Europe? We have found that most products comply with Blue Angel and EU Ecolabel, which are not accepted under LEED...

Last reply: Tera Bartman, Mar 7, 2024, 4:50 pm

Lighting Zone for a Terminal Building

NC-v4 SSc6: Light Pollution Reduction
posted by Gustavo De las Heras Izquierdo on Mar 15, 2023, 8:46 pm

Hello,

We are certifying the Terminal Building in a new international airport. We wonder how to categorize the project, since lighting zones are not well defined. A Terminal Building needs...

Last reply: Afogreen Build, Mar 7, 2024, 3:33 am

100% nonportable water for cooling tower

NC-v4 WEc3: Cooling tower water use
posted by Thomas Tran on Feb 13, 2019, 4:08 am

Hi,

LEED reference document says in the Required document Table (page 309):

- Nonportable water analysis (if use 100% nonportable water) -------------------------------------- 2...

Last reply: Afogreen Build, Mar 7, 2024, 3:24 am

Partial Floor LEED Certification

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 7, 2024, 12:14 am

I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified.  The project space is approximately 52% - 60% of the total floor area, but it...

Office space only going for partial renovation.

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by shashank gangil on May 14, 2021, 8:30 am

We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors. Total renovated area is approximately 30% of the total...

Last reply: Edgar Arevalo, Mar 7, 2024, 12:14 am