Topic | Recent |
---|---|
Our project needs some clarification regarding Minimum Indoor Air Quality Performance Calculator.CI-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Sep 19, 2023, 4:47 am
One of my LEED v4 ID+C project getting below comments from LEED reviewer for Minimum Indoor Air Quality Performance Calculator (Project having... Last reply: Dave Hubka, Jan 19, 2024, 7:48 am |
|
Using Existing LEED certified Parking for EV Charger Installation in New ProjectNC-v4 LTc8: Green vehiclesposted by sompoche sirichote on Jan 16, 2024, 9:51 am
We have a two-phase project: Phase 1 and Phase 2.
Last reply: Emily Purcell, Jan 18, 2024, 4:05 pm |
|
Entryway system for little occupied areas without access to the rest of the buildingNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Paola Moschini on Jan 18, 2024, 4:29 am
Dear all, we have a warehouse building with a break area for truck drivers, it's made up of break space and toilets, has... Last reply: Dave Hubka, Jan 18, 2024, 8:01 am |
|
CO2e lb/mile per transport or per personEBOM-v4.1 LTp1: Transportation Performanceposted by Jorge Lopez de Obeso on Jun 21, 2023, 11:55 am
Good Day! Last reply: Yusuf Turab, Jan 18, 2024, 2:31 am |
|
2 Questions on DocumentationNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Stephan Zweig on Sep 25, 2023, 8:39 am
Dear Leed Users, I have following questions concerning the documentation of this credit
Last reply: Allison Para, Jan 17, 2024, 1:57 pm |
|
Hiring- LEED Project AdministratorHelp Wanted: LEED-related Jobsposted by Trisha Highnote on Jan 17, 2024, 11:12 am
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR. We seek a person with three or more years of experience in sustainable design and construction to... |
|
Sample testing required?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by on Sep 19, 2023, 12:48 pm
Hello everyone, Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or... Last reply: Glen Boldt, Jan 16, 2024, 9:08 pm |
|
Chlorine Flush vs. IAQ AssessmentNC-v4.1 EQc4: Indoor air quality assessmentposted by Mike Bahr on Dec 8, 2023, 9:59 am
Has anyone here done an... Last reply: Catalyst Partners, Jan 16, 2024, 3:47 pm |
|
Alternative measurement to material costsNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Ingrid Pohl on Jan 15, 2024, 4:32 am
I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?... |
|
Baseline ExamplePilot-Credits IPpc93: Prevention through designposted by Logan McNeil on Mar 22, 2019, 5:48 pm
Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project. However, the team noted that it would have... Last reply: Dionisio Franca, Jan 15, 2024, 3:41 am |