Log in
Forum » CS-2009 EAp2
Loading...
Topic

Non-centralised AC for office tower

CS-2009 EAp2: Minimum Energy Performance
posted by Edwin Wealend on Sep 8, 2010, 12:25 am

HI,

We are working on a small soho office tower, about 28 floors tall with a GFA of around 20000m2. We want to use split type or VRV AC unit for the offices instead of doing a full blown...

Last reply: Edwin Wealend, Sep 16, 2010, 7:44 pm

Target Finder in UAE

CS-2009 EAp2: Minimum Energy Performance
posted by V. Miller on Sep 15, 2010, 9:41 am

Hi Dear,

I am trying to use the target finder for a project in UAE, but it does not allow for any international location. Can I leave it blank?

Cheers,
V

Last reply: Christopher Schaffner, Sep 15, 2010, 9:51 am

restaurant equipment

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:14 pm

Should future restaurant equipment be enluded in the calcs?

Last reply: Marcus Sheffer, Aug 20, 2010, 3:08 pm

Lighting and Equipment controlled by BMS

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:19 pm

What is the corret way of calculating lighting and equipment controlled by Building Management System?

Last reply: Marcus Sheffer, Aug 20, 2010, 2:20 pm

Computer load

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:11 pm

Should a computer be calculated as 400W or according to Energy star in our case 175 KWh/annual or around 80 W?: ref: http...

Last reply: Christopher Schaffner, Aug 19, 2010, 8:05 am

Exterior Building Lighting Power calculation

CS-2009 EAp2: Minimum Energy Performance
posted by Adriana Hansen on Aug 5, 2010, 1:48 pm

Hello,

I am going to certify a shopping center and I have two questions:

1) Its façade uses recessed volumes to create movement and interesting angles, interposing façade panels at...

Last reply: Christopher Schaffner, Aug 9, 2010, 8:12 pm

EAp2 LEED Online form

CS-2009 EAp2: Minimum Energy Performance
posted by Richard Fost on May 4, 2010, 4:42 pm

For a core & shell project in which the developer does not have control over interior (tenant) build-out, why does the LEED Online form require (or is automatically populated with) EPA Target...

Last reply: Christopher Schaffner, Jun 30, 2010, 7:01 pm

U-Values Requirements for Skylight with Curbs

CS-2009 EAp2: Minimum Energy Performance
posted by Ghaith Moufarege on Mar 31, 2010, 6:07 am

Hello,

This credit requires us to comply with the U-values prescribed by ASHRAE Standard 90.1-2007.

Our project has a Glass skylight covering more than 5% of the roof. The U-...

Last reply: Tristan Roberts, Apr 1, 2010, 8:48 am