Topic | Recent |
---|---|
Exhaustion rates in WCNC-v4 EQp1: Minimum indoor air quality performanceposted by Maria Matos on Mar 24, 2017, 3:49 pm
Dear all, I would like to know if it is mandatory to comply with minimum exhaust rates indicated in TTABLE 6-4 Minimum Exhaust Rates from ASHRAE 60.1 -2010. We think that the... Last reply: Christopher Schaffner, Apr 20, 2017, 11:34 am |
|
Demolished and rebuilt envelopeNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Apr 15, 2017, 6:26 am
If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply? It states: "For existing building envelopes, the baseline building design... Last reply: Marcus Sheffer, Apr 17, 2017, 10:25 am |
|
Treatment of District or Campus Thermal Energy in LEED v4NC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Mar 7, 2017, 7:30 am
Can the document "Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction" be used also for LEED v.4? Any news about an updated version of that... Last reply: Marcus Sheffer, Apr 17, 2017, 10:24 am |
|
Building's equipment still uncertainNC-v4 EAc3: Advanced Energy Meteringposted by Maria Matos on Apr 6, 2017, 6:38 am
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar. This building... Last reply: Marcus Sheffer, Apr 12, 2017, 9:35 am |
|
ReflectanceNC-v4 EQc7: Daylightposted by Inês Marques on Apr 4, 2017, 2:04 pm
Hi everyone, I'm having trouble finding datasheets with the reflectance values for the project I'm working on. Do you think using standard values expressed for example in this website... Last reply: Daniel Glaser, Apr 5, 2017, 11:44 am |
|
Lots and open space questionNC-2009 SSc5.2: Site development - maximize open spaceposted by Albert Sagrera on Apr 3, 2017, 11:17 am
Hello, We are wondering if a future building occupying two different plots can be In the case that it is considered as a single... Last reply: Allison Smith, Apr 3, 2017, 11:45 am |
|
LCA calculationNC-v4 MRc1: Building life-cycle impact reductionposted by Emmanuel Pauwels on Mar 23, 2017, 2:10 pm
1- When performing a LCA calculation for the envelope and... Last reply: Panu Pasanen, Mar 27, 2017, 9:21 am |
|
Option 1: Zoning and controlsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Ricardo Sá on Mar 21, 2017, 8:38 am
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation... Last reply: Marcus Sheffer, Mar 21, 2017, 11:09 am |
|
Option 1: Equipment EfficiencyCI-2009 EAc1.3: Optimize energy performance - HVACposted by Ricardo Sá on Mar 21, 2017, 8:56 am
Hi, I have several compact rooftop units serving a big sales area. However, only 80% of them is actually new equipment that meet the credit's criteria. If the project reuses old equipment... Last reply: Marcus Sheffer, Mar 21, 2017, 10:36 am |
|
Daylight and quality views measurement in a special buildingEBOM-v4 EQc5: Daylight and quality viewsposted by Ana Villarroya on Mar 13, 2017, 5:39 am
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.... Last reply: TODD REED, Mar 13, 2017, 7:53 am |