Topic

Daylight simulation

NC-2009 IEQc8.2: Daylight and views - views
posted by Danielle Waters on Jun 27, 2019, 4:33 pm

If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator? Or would the simulation...

Interior Reuse- shared walls with other businesses

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Lou Niles II on Jun 27, 2019, 2:05 pm

Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope. The other side of...

Gas Fired Generators for Backup/Emergency

NC-2009 EAc1: Optimize Energy Performance
posted by Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C on Jun 26, 2019, 1:05 pm

Hello,

 I'd like advice on how to model high pressure gas to fuel three 300 kW backup generators. There is also subsequently piping in natural gas from the local utility used as fuel for...

Last reply: Marcus Sheffer, Jun 27, 2019, 1:21 pm

Modeling Electric Heaters

NC-2009 EAp2: Minimum Energy Performance
posted by Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C on Jun 26, 2019, 1:27 pm

Hi,

 I'd like advice on the best approach to model Electric Heaters for stairways, vestibules, gas and water meter room.  We two types of e-heaters 1) with a built in single pole...

Last reply: Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C, Jun 27, 2019, 12:46 pm

Core and shell building’s energy

CS-v4 EAc5: Renewable energy production
posted by Devendra Chaughule on Jun 27, 2019, 10:34 am

Dear All,

We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by...

Last reply: Marcus Sheffer, Jun 27, 2019, 11:11 am

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jun 27, 2019, 8:42 am

Hi,

Do we have minimum requirements for the size and configuration of changing facility shower ?

Thanks
Marion

Metering make-up water for geothermal system

NC-v4 WEc4: Water metering
posted by Daniel Davis on May 22, 2019, 5:45 pm

We are installing a meter onto the geothermal well water...

Last reply: Nadav Malin, Jun 27, 2019, 7:28 am

Rainwater Harvesting / Domestic Hot Water

NC-v4.1 WEc4: Water metering
posted by Michael Kelly on Apr 10, 2019, 2:29 pm

1) Does...

Last reply: Nadav Malin, Jun 27, 2019, 6:29 am

Use of bidets

NC-v4 WEp2: Indoor water use reduction
posted by Jorge Adalberto Bernal Segovia on Jun 26, 2019, 2:20 pm

Hello,
We have a residential building project, in which bidets will be used in the toilets. But inside the calculator of the Indoor Water Use Reduction I do not check the option to add it...

Last reply: Jorge Adalberto Bernal Segovia, Jun 26, 2019, 4:54 pm

Vegetation Under PVs

NC-2009 SSc7.2: Heat island effect - roof
posted by Meghan Cole on Jun 24, 2019, 2:34 pm

Hi there,

We have a project that has placed PV panels above some of the vegetated...

Last reply: David Posada, Jun 26, 2019, 4:49 pm