Log in
Forum
Topic

LEED Online (& usgbc.org) site are down

Navigating LEED Online
posted by Nadav Malin on Nov 25, 2019, 10:30 am

Hi folks,

People have been complaining about this problem on the EAp2 page forum, so I thought I'd try to give it a better home here. Sounds like there have been some promises of when it...

Last reply: Alara Matsyk, Apr 6, 2020, 10:18 am

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: Tiffany Beffel, Apr 5, 2020, 12:42 pm

Composite Wood Documentation

NC-v4 EQc2: Low emitting materials
posted by Vanessa Nelson on Apr 2, 2020, 12:24 pm

Is a manufacturer provided product Info sheet stating a plywood product does not contain urea formaldehyde sufficient documentation for the composite...

Last reply: Keith Robertson, Apr 5, 2020, 9:12 am

Compliant EPR Programs

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Amanda Tullos on Jan 9, 2020, 1:22 pm

Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#...

Last reply: Allen Cornett, Apr 4, 2020, 1:53 pm

Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?

NC-v4 EQc2: Low emitting materials
posted by Renee Shirey on Jun 26, 2019, 6:57 pm

Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for...

Last reply: Lianne Parker, Apr 3, 2020, 5:20 pm

Mechanical Equipment that serves our LEED project is located on the roof of a different (non-certified) Building

Healthcare-v4 MPR2: Must use reasonable LEED boundaries
posted by Gordon Ingerson on Mar 30, 2020, 4:35 pm

I am working on a BD+C: Healthcare project that is a new building addition adjacent to an existing hospital. As this building is being designed for possible vertical expansion in the future, we...

Last reply: Tristan Roberts, Apr 3, 2020, 10:41 am

Shall Re-Cooler AHUs (they are integrated DX heat pumps coupled with thermal wheels) be included in Enhanced Refrigerant manag

CS-v4 EAc6: Enhanced Refrigerant Management
posted by Sadaf Alam on Apr 3, 2020, 4:57 am

Hi All,

We have core and shell project office building. We have Re-Cooler...

Electric vehicles under campus appoach

NC-v4 LTc8: Green vehicles
posted by Angel Guerra on Apr 3, 2020, 4:54 am

Hi all,

I'm working on a building that will be in a master site previously LEED certified under a campus appoach. Inside the LEED border there are parking spaces associated to the...

Green Plaque website no response and no Certificates for Projects?

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Robert Fernandez on Apr 1, 2020, 4:36 pm

Hello,

Not sure where to post this but is anyone else having trouble with Green Plaque? I just received access to one of my certified projects and the congratulatory letter was formatted...

Last reply: Robert Fernandez, Apr 2, 2020, 11:55 am

Demand Controlled Ventilation

NC-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Apr 2, 2020, 7:18 am

Greetings,

There is a question regarding the requirements related to DCV – 6.4.3.8 and specifically Exception 4. – “Spaces where >75% of the space design OA is required for makeup air...

Last reply: Francesco Passerini, Apr 2, 2020, 10:31 am