Hourly Data for Rainwater Harvesting CalculationNC-2009 WEp1: Water Use Reductionposted by Christian Kaltreider on Apr 1, 2016, 10:37 am
Hello, I need to do a... Last reply: Christian Kaltreider, Apr 4, 2016, 1:53 pm |
|
Provide the source of dataHealthcare-v2009 MRc4.2: PBT source reduction - lead, cadmium and copperposted by Matt Luedders on Apr 4, 2016, 12:40 pm
Under the lead section, the credit language includes the requirement to "Upload lead documentation. Provide the source of lead and/or cadmium data..." |
|
LEED LabPilot-Credits IPpc96: LEED Labposted by Stacey White on Apr 2, 2016, 9:26 pm
Cuesta College typically holds two LEED Lab sessions a year. We are lucky to work with several Community Partners working on projects in every rating system. This program gives our students... |
|
Enhance Cx, 10 month review of building operationNC-2009 EAc3: Enhanced Commissioningposted by Laura Howe on Mar 29, 2016, 3:32 pm
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion? Last reply: Scott Bowman, Mar 31, 2016, 9:36 pm |
|
Design for Active ParticipantsPilot-Credits EQpc78: Design for active occupantsposted by Robert Fiala on Sep 30, 2015, 8:00 am
We found this pilot credit after our school project was designed and beginning construction. We were able to meet the pilot credit options because most of the requirements were standard design... Last reply: Angela Wisely, Mar 31, 2016, 1:01 pm |
|
HPD- predicted by process chemistryNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Suzanne Drake on Mar 30, 2016, 2:05 pm
"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit? Given that there are no ppms associated with... Last reply: Paula Melton, Mar 31, 2016, 11:45 am |
|
MOB- Recycling CalculationsHealthcare-v2009 MRp1: Storage and Collection of Recyclablesposted by Lauren Bellamy on Oct 3, 2014, 2:24 pm
I am working on this credit for a new MOB. I have looked online without any success on a baseline for the projected volume of recyclables. Is there a tool that would help a new building that does... Last reply: Susan Walter, Mar 31, 2016, 8:51 am |
|
Generator details:posted by Matt Luedders on Mar 30, 2016, 11:24 am
The credit does not specify that the generator must be permanently installed. Does a permanent connection point and transfer switch for a portable generator satisfy the credit requirement? |
|
In-Unit LightingNC-2009 EAp2: Minimum Energy Performanceposted by Khaled Fouda on Mar 14, 2016, 1:54 pm
I've received a comment from the LEED reviewer after they denied my approach in calculating the... Last reply: Marcus Sheffer, Mar 30, 2016, 11:21 am |
|
LEED Selection- High Rise ResidentialLEED Rating System Selectionposted by Curt Pascoe on Feb 12, 2016, 4:41 pm
I am working on a unique project. 30 story existing... Last reply: Victoria Civitillo, Mar 30, 2016, 9:08 am |