Topic | Recent |
---|---|
MOB- Recycling CalculationsHealthcare-v2009 MRp1: Storage and Collection of Recyclablesposted by Lauren Bellamy on Oct 3, 2014, 2:24 pm
I am working on this credit for a new MOB. I have looked online without any success on a baseline for the projected volume of recyclables. Is there a tool that would help a new building that does... Last reply: Susan Walter, Mar 31, 2016, 8:51 am |
|
Generator details:posted by Matt Luedders on Mar 30, 2016, 11:24 am
The credit does not specify that the generator must be permanently installed. Does a permanent connection point and transfer switch for a portable generator satisfy the credit requirement? |
|
In-Unit LightingNC-2009 EAp2: Minimum Energy Performanceposted by Khaled Fouda on Mar 14, 2016, 1:54 pm
I've received a comment from the LEED reviewer after they denied my approach in calculating the... Last reply: Marcus Sheffer, Mar 30, 2016, 11:21 am |
|
LEED Selection- High Rise ResidentialLEED Rating System Selectionposted by Curt Pascoe on Feb 12, 2016, 4:41 pm
I am working on a unique project. 30 story existing... Last reply: Victoria Civitillo, Mar 30, 2016, 9:08 am |
|
Metered Faucet: Max GPC or Flow Rate x Duration?NC-2009 WEp1: Water Use Reductionposted by Christian Kaltreider on Mar 29, 2016, 9:32 am
Hello, Last reply: Christian Kaltreider, Mar 29, 2016, 1:40 pm |
|
Case 2, Option 1- how many different support programs required?NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Erica Downs on Apr 23, 2015, 2:13 pm
There is a thread below (started April 2013, subject line: Mixed use Last reply: Kimberly Schlaepfer, Mar 29, 2016, 11:29 am |
|
submetering general requirements and strategy for metering HVACCI-2009 EAc3: Measurement and Verificationposted by Rob Pinkston on Mar 28, 2016, 4:12 pm
Hello, Last reply: Rob Pinkston, Mar 29, 2016, 11:08 am |
|
Historic Bldg Renovation being done in phases, C&D Waste calcsNC-2009 MRc2: Construction Waste Managementposted by Debra a. Lombard on Mar 24, 2016, 11:53 amRETIRED LEEDuser Expert 622 thumbs up March 28, 2016- 6:31 pm Debra- I can't answer part two of your question related to building reuse. I encourage you to post your question on the MRc1.1 or MRc1.2 forum(s)- http://www.leeduser.com/credit/NC-2009/MRc1.1 or http://www.leeduser.com/credit/NC-2009/MRc1.2. Be sure to review the Related Credits information for MRc1.1 and MRc1.2 in regards to MRc2 and vice versa. It is unfortunate that the GC was not included in the critical conversation regarding LEED and construction waste and that the waste diversion for the first phase is low and the records... Last reply: RETIRED, Mar 28, 2016, 6:31 pm |
|
Historic Bldg Renovation being done in phases, Bldg reuse calcsNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Debra a. Lombard on Mar 24, 2016, 12:00 pm
I'm working on behalf of a... Last reply: Megan White, Mar 28, 2016, 2:39 pm |
|
Adhesive creditsNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Patricia Taylor on Mar 23, 2016, 7:42 amand the characteristics (for example, recycled content) of each product in the CSI Divisions listed above divided by the total cost of ALL materials in those same Divisions. (See the LEEDuser MR Credit forums.) The cost... Last reply: Patricia Taylor, Mar 28, 2016, 8:14 am |