Log in
Forum » U.S. and Canada
Topic

ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Avery Colter on Apr 25, 2016, 8:52 pm

OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook. I have the 2015 Handbook, and there in Section 53.7 is an equation which, adjusted for units, has differential Pa at...

EAp2

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Peter Doo on Apr 25, 2016, 3:02 pm

If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance...

Last reply: Marcus Sheffer, Apr 25, 2016, 3:14 pm

Exemplary Performance?

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by José Solis on Mar 24, 2016, 5:39 pm

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states...

Last reply: José Solis, Apr 25, 2016, 2:47 pm

Room Input Report

NC-2009 IEQc7.1: Thermal comfort - design
posted by Bill Friedl on Apr 22, 2016, 11:52 am

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space...

Last reply: Cam Fitzgerald, Apr 25, 2016, 2:12 pm

The envelope data for old building (baseline) are not avaiable

NC-2009 EAp2: Minimum Energy Performance
posted by James Lee on Apr 22, 2016, 5:31 pm

Hi,
I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec. no...

Last reply: Marcus Sheffer, Apr 25, 2016, 11:13 am

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Amy Harmon on Apr 18, 2016, 5:20 pm

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH....

Last reply: Dave Hubka, Apr 22, 2016, 10:07 am

RCI CORR Information

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by John Danby on Apr 21, 2016, 4:29 pm

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification. If you go to the RCI site (...

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4: Recycled Content
posted by Susan Di Giulio on Dec 1, 2015, 6:15 pm

Hi,

We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects...

Last reply: Robin Dukelow, Apr 21, 2016, 1:50 pm

DDA Boundary

NC-v4 LTc3: High priority site
posted by Trevor Anderson on Apr 19, 2016, 10:49 am

Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?

Last reply: Larry Sims, Apr 21, 2016, 11:27 am

REVIT 2016 Daylight Analysis Tool not acceptable?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Deborah Lucking on Apr 20, 2016, 5:36 pm

We submitted for this credit using the results from the REVIT 2016 daylight analysis tool. Both the Lighting Analysis plans and the Room Schedule Threshold results were submitted as part of the...

Last reply: TODD REED, Apr 21, 2016, 8:39 am