Log in
Forum
Loading...
Topic

Impact of the suspension period (3 years) on the Certification’s points score

LEED Recertification: When and How
posted by Johann Barata on Aug 2, 2018, 3:41 am

Trista Little Senior Consultant, WSP USA LEEDuser Expert 353 thumbs up March 22, 2019- 7:31 pm Hi Johann, this forum is about recertification under the LEED-EBOM rating system. I'd recommend contacting GBCI directly to discuss the situation that you outlined above. They will be able to discuss the specifics of what happened and help you with a path forward. Good luck! Log in or register to post comments ...

Last reply: Trista Little, Mar 22, 2019, 7:31 pm

Company specific LEED instruction

LEED Recertification: When and How
posted by Bobby White on Jul 26, 2018, 5:26 pm

Trista Little Senior Consultant, WSP USA LEEDuser Expert 353 thumbs up March 22, 2019- 7:26 pm Hi Bobby, it sounds like your question is focused more on materials than project recertification. I recommend posting your question to a Materials & Resources credit forum, or maybe the tipsheet focused on materials libraries (https://leeduser.buildinggreen.com/tipsheet/product-libraries-leed-v4-ma...).  Log in or register to post comments ...

Last reply: Trista Little, Mar 22, 2019, 7:26 pm

University Housing

Schools-NC-v4 LTc5: Access to quality transit
posted by Sean Adams on Mar 22, 2019, 2:10 pm

We are doing a university housing project and have been basing it off of the BD+C New Construction but for this section if we are able to do it under School-NC we would be able to get the 4...

Pilot Credit- Forum Participation

Pilot-Credits IPpc101: Integrative process
posted by Faun Carlson on Aug 17, 2017, 1:17 pm

in the Forum. I would agree that the number of meetings is very project specific. For our project, we've been working with many of the same team members on over 5 EB certifications over the past year,...

Last reply: Karen Mahrous, Mar 22, 2019, 1:29 pm

Pilot Credit MRpc87- Verified Construction and Demolition Rates

NC-v4 MRc5: Construction and demolition waste management
posted by Tiffany Wilmot on Mar 21, 2019, 7:10 pm

Michelle Reott Managing Principal, Earthly Ideas LLC LEEDuser Expert 616 thumbs up March 22, 2019- 11:05 am Hi Tiffany- Please review the pilot credit forum- https://leeduser.buildinggreen.com/credit/Pilot-Credits/MRpc87. You might want to see if your question is answered and if not, post it on that forum. Log in or register to post comments ...

Last reply: Michelle Reott, Mar 22, 2019, 11:05 am

Minimum Indoor air quality compliance procedure- 100% OA AHU with zone level recirculation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Isabel Santos on Mar 15, 2019, 11:11 am

Hello Everyone,

I have an office floor that is conditioned by a Fresh Air handling Unit (100% Outdoor Air) with Heat Recovery and in some enclosed office spaces we have Fan Coil Units (FCU...

Last reply: otto, Mar 22, 2019, 9:43 am

CASE 3- pedestrian-oriented hardscape area & 25% vegetated area

CS-2009 SSc5.2: Site development - maximize open space
posted by Michal Marszalek on Nov 3, 2012, 6:11 am

Hi

I have a question about this description: pedestrian-oriented hardscape areas can contribute to credit compliance. For such projects, a minimum of 25% of the open space counted must be...

Last reply: Yoyo Shek, Mar 22, 2019, 5:43 am

Process Water Appliances not installed by owner, tenants not yet defined

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on Mar 22, 2019, 4:21 am

Hi,

we’re currently working on a LEED certification of a new office building, in which the scope of works does not include the installation of process water appliances. The office building...

LEED4.1 Multi-attribute optimization- life cycle impact reductions in embodied carbon

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Dionisio Franca on Mar 22, 2019, 3:04 am

Quoted from the 4.1 Beta:

Option 2. Multi-Attribute Optimization (1 point)
Use products that comply with one of the criteria below for 10%, by cost, of the total value of
...

Projects located where standard supply pressure is different than the LEED baseline supply pressure

NC-v4 WEp2: Indoor water use reduction
posted by Maki Watanabe on Mar 22, 2019, 1:40 am

In LEED v4.1 WE Prerequisite: Indoor Water Use Reduction requirement, it reads:

Projects located where standard supply pressure is different than the LEED baseline supply pressure may...

Last reply: Maki Watanabe, Mar 22, 2019, 1:47 am