Daylight Sensors in Factory Area

NC-v4 EAp2: Minimum Energy Performance
posted by N Sai Balaji on Apr 10, 2019, 1:51 am

Hi,

I am working for a proposed LEED Factory in Bangladesh. As part of Mandatory requirements in ASHRAE 90.1 2010 Section 9.4.1.4, Automatic Daylighting Controls for Primary Sidelighted...

Last reply: Marcus Sheffer, Apr 10, 2019, 11:29 am

LEED Certification- Buildings inside a campus

LEED Rating System Selection
posted by Ricardo Sá on Apr 10, 2019, 10:29 am

Dear All,

we were contacted to make a commercial proposal for the LEED certification of 3 interdependent buildings located in the same campus:

  • large office building;
  • ...

Bike Share Location

NC-v4.1 LTc6: Bicycle facilities
posted by Max Krueger on Apr 8, 2019, 2:21 pm

In a campus setting can the bike share be located nearby, on-campus, but outside of the LEED boundary?

Thanks,
Max

Last reply: Emily Purcell, Apr 10, 2019, 10:20 am

Clean Fill

NC-v4 MRc5: Construction and demolition waste management
posted by Sean Adams on Apr 10, 2019, 6:20 am

We have a project going right now and one of our dumpsters we have listed as clean fill in which we put in concrete/brick/cmu which according to LEED V4 is an acceptable recyclable but the weight...

Last reply: Renee Shirey, Apr 10, 2019, 8:39 am

3 buildings that connected via link-bridge

LEED Guidance for Campuses and Multiple Buildings
posted by Michael Wahjudi on Mar 22, 2017, 12:23 am

Hi all. Wanted to seek your comments on consideration of our developments as "single building" so it can fit into one LEED certification. Our development is consists of 3 buildings that connected...

Last reply: David Hubka, Apr 10, 2019, 7:34 am

BMS as Thermal Comfort Contol

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Kristen Gomez on Apr 5, 2019, 3:22 am

Has anyone pursued this credit using BMS as thermal comfort control?

I have a project with several spaces supplied by FCU that is controlled or the temperature can be controlled through...

Last reply: David Hubka, Apr 9, 2019, 11:10 pm

Cooling tower makeup water meter

NC-v4 WEc4: Water metering
posted by Summer Gorder on Apr 9, 2019, 4:19 pm

Can a cooling tower...

Last reply: David Hubka, Apr 9, 2019, 10:49 pm

Parking Garage Lighting control credit

NC-v4 EAp2: Minimum Energy Performance
posted by Saif A on Apr 5, 2019, 3:14 pm

Hi everyone,

I am using the building area method to calculate the lighting power for the parking garage. The Baseline building garage lighting power is 57.42 kW and the Designed lighting...

Last reply: Michael Brown, Apr 9, 2019, 5:44 pm

Indirectly Conditioned Space Inclusion

NC-v4 EAp2: Minimum Energy Performance
posted by Hannah Helminiak on Apr 8, 2019, 5:02 pm

Hi all, 

Our building is just slightly over 25,000 sf, so we're needing to get very detailed so as to not include any unconditioned spaces in the energy model in order to meet the...

Last reply: Marcus Sheffer, Apr 9, 2019, 5:42 pm

No Cooling Tower pilot credit

Pilot-Credits WEpc94: No Cooling Tower
posted by Gail Napell on Oct 30, 2018, 12:59 am

Hi all

we're pursuing this credit and received a comment from the LEED reviewer that we need to submit the survey confirmation e-mail in order to achieve the credit.  The survey asks if we...

Last reply: James Tosh, Apr 9, 2019, 9:37 am