Building Demoliton outside my LEED Boundary

NC-2009 MRc2: Construction Waste Management
posted by Faith Wilbert on Aug 8, 2016, 4:11 pm

Hello,
I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished. Do I need to include...

Last reply: RETIRED, Aug 14, 2016, 2:51 pm

Cold Climate

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Erin Holdenried on Apr 5, 2016, 7:30 pm

Does anybody have experience using an alternate compliance path for a project in a cold climate?

Last reply: Tristan Roberts, Aug 12, 2016, 7:35 pm

Exemplary Performance

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Allen Cornett on Feb 2, 2016, 3:12 pm

Can exemplary performance be documented by combining Option 1 and Option 2? For example if 1,000 parking spaces are in a parking garage, and 10 "twenty minute parking only" surfaces spaces are...

Last reply: Ashwini Arun, Aug 12, 2016, 6:27 pm

SSc2

NC-2009 SSc2: Development Density and Community Connectivity
posted by Erika Duran on Jul 22, 2016, 12:26 pm

I am working towards the SSc2 credit. Two buildings are currently under
construction and floor and site area are unavailable. What should I do?

Thanks,
Erika

Last reply: Landry Watson, Aug 12, 2016, 1:29 pm

residential kitchen- spray nozzle

NC-2009 WEc3: Water Use Reduction
posted by Erin Holdenried on Aug 9, 2016, 4:45 pm

Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve? I...

Last reply: Carlie Bullock-Jones, Aug 11, 2016, 11:36 am

"DES Energy Cost" Thread Follow-Up

NC-2009 EAc1: Optimize Energy Performance
posted by Joseph Chappell on Aug 9, 2016, 3:47 pm

In a previous post titled "...

Last reply: Marcus Sheffer, Aug 11, 2016, 10:04 am

Sculpture Lighting

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Kristopher Croghan on Aug 9, 2016, 3:47 pm

Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting. While the sculpture will give some ambient lighting, it is not intended to be the main...

Last reply: Marcus Sheffer, Aug 11, 2016, 9:37 am

Determining Site Boundary on Renovations/Additions

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Andrew Buck on Aug 4, 2016, 5:58 pm

We are working on a Hotel that is both a renovation and major new construction. 5 floors of hotel are being built on top of a section of large existing exhibition space, and the lower section of...

Last reply: Tristan Roberts, Aug 9, 2016, 1:58 pm

IEQc4.5 Uncertified Furnishings

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Emily Neal on Aug 4, 2016, 3:39 pm

Hello,
I'm a little confused with this credit. I've entered all the information that I have for the systems furniture that is Greenguard or ANSI certified. I have one piece that is not...

Last reply: Tristan Roberts, Aug 9, 2016, 1:57 pm

ID Credit for Radon Mitigation system

NC-2009 IDc1: Innovation in Design
posted by Tyler Barter on Aug 8, 2016, 12:09 pm

We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project. The submission included the project narrative,...

Last reply: Scott Bowman, Aug 9, 2016, 10:50 am