Topic | Recent |
---|---|
Building Demoliton outside my LEED BoundaryNC-2009 MRc2: Construction Waste Managementposted by Faith Wilbert on Aug 8, 2016, 4:11 pm
Hello, Last reply: RETIRED, Aug 14, 2016, 2:51 pm |
|
Cold ClimateNC-2009 SSc7.1: Heat island effect - nonroofposted by Erin Holdenried on Apr 5, 2016, 7:30 pm
Does anybody have experience using an alternate compliance path for a project in a cold climate? Last reply: Tristan Roberts, Aug 12, 2016, 7:35 pm |
|
Exemplary PerformanceNC-2009 SSc7.1: Heat island effect - nonroofposted by Allen Cornett on Feb 2, 2016, 3:12 pm
Can exemplary performance be documented by combining Option 1 and Option 2? For example if 1,000 parking spaces are in a parking garage, and 10 "twenty minute parking only" surfaces spaces are... Last reply: Ashwini Arun, Aug 12, 2016, 6:27 pm |
|
SSc2NC-2009 SSc2: Development Density and Community Connectivityposted by Erika Duran on Jul 22, 2016, 12:26 pm
I am working towards the SSc2 credit. Two buildings are currently under Thanks, Last reply: Landry Watson, Aug 12, 2016, 1:29 pm |
|
residential kitchen- spray nozzleNC-2009 WEc3: Water Use Reductionposted by Erin Holdenried on Aug 9, 2016, 4:45 pm
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve? I... Last reply: Carlie Bullock-Jones, Aug 11, 2016, 11:36 am |
|
"DES Energy Cost" Thread Follow-UpNC-2009 EAc1: Optimize Energy Performanceposted by Joseph Chappell on Aug 9, 2016, 3:47 pm
In a previous post titled "... Last reply: Marcus Sheffer, Aug 11, 2016, 10:04 am |
|
Sculpture LightingCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Kristopher Croghan on Aug 9, 2016, 3:47 pm
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting. While the sculpture will give some ambient lighting, it is not intended to be the main... Last reply: Marcus Sheffer, Aug 11, 2016, 9:37 am |
|
Determining Site Boundary on Renovations/AdditionsHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Andrew Buck on Aug 4, 2016, 5:58 pm
We are working on a Hotel that is both a renovation and major new construction. 5 floors of hotel are being built on top of a section of large existing exhibition space, and the lower section of... Last reply: Tristan Roberts, Aug 9, 2016, 1:58 pm |
|
IEQc4.5 Uncertified FurnishingsCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Emily Neal on Aug 4, 2016, 3:39 pm
Hello, Last reply: Tristan Roberts, Aug 9, 2016, 1:57 pm |
|
ID Credit for Radon Mitigation systemNC-2009 IDc1: Innovation in Designposted by Tyler Barter on Aug 8, 2016, 12:09 pm
We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project. The submission included the project narrative,... Last reply: Scott Bowman, Aug 9, 2016, 10:50 am |