Topic | Recent |
---|---|
Signed Contract with the CxANC-2009 EAc3: Enhanced Commissioningposted by Mohamed M. Abd Elhameed on Jul 1, 2015, 4:22 am
We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt. Building Owner is a multinational design firm who do both tasks, the project design and the... Last reply: Scott Bowman, Jun 30, 2016, 4:51 pm |
|
Flat landND-Plan-v4 SLLc6: Steep slope protectionposted by Flavia Marques on Nov 16, 2015, 3:19 am
How about if there is no slope can we achieve the credit by default? Last reply: Eliot Allen, May 26, 2016, 11:25 am |
|
SRI of sandNC-2009 SSc7.1: Heat island effect - nonroofposted by Karim Farah on Sep 23, 2014, 2:10 am
Does anybody know the... Last reply: RETIRED, May 25, 2016, 1:36 pm |
|
School BuildingNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on May 25, 2016, 7:42 am
Hi, Last reply: Marcus Sheffer, May 25, 2016, 9:43 am |
|
Maximum TemperatureNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Omar Elrawy on May 8, 2016, 8:07 am
Dear All, Last reply: Dave Hubka, May 12, 2016, 8:21 am |
|
Campus for a gated residential/commercial compound versus NDLEED Guidance for Campuses and Multiple Buildingsposted by ABDELHAMID BESHARA on Feb 23, 2016, 3:46 pm
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models. The buildings are distributed on two main pieces of land of equal areas separated... Last reply: Eric Anderson, Apr 30, 2016, 12:23 pm |
|
Ashrae 90.1 2010 Appendix GNC-v4 EAp2: Minimum Energy Performanceposted by junaid naseer on Apr 19, 2016, 1:28 am
Do we need to follow addendums of ASHRAE 90.1 2010 in relation to Appendix G for compliance? For instance, addendum F restricts window to wall ratio to 34% for hotel/motel with rooms... Last reply: Marcus Sheffer, Apr 25, 2016, 10:18 am |
|
Number of IAQ samples required?NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Michael Boyle on Apr 13, 2016, 5:29 am
Our project consists of (5 townhouse + multipurpose room). This is considered as one building. townhouses are 3-5 floors and each is served by 1... Last reply: Tom Nichols, Apr 13, 2016, 7:09 am |
|
Campus approach in a gated residential compound or ND?LEED Rating System Selectionposted by ABDELHAMID BESHARA on Feb 23, 2016, 3:38 pm
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models. The buildings are distributed on two main pieces of land of equal areas separated... Last reply: Eliot Allen, Apr 11, 2016, 11:21 am |
|
Rating system for an Existing Office spaceLEED Rating System Selectionposted by Shijo John on Feb 3, 2016, 7:30 am
Dear All, We have an existing office (around 2-3 years old) which we want to get LEED certified. However, it is a part (tenant space) of mixed-use building. It is not clear to me which... Last reply: Tristan Roberts, Apr 10, 2016, 7:58 am |