Log in
Forum
Loading...
Topic

Indoor Air Measurements

EBOM-v4.1 EQc1: Indoor Environmental Quality Performance
posted by Gustav Alfaro on Jun 5, 2019, 12:20 pm

Hi to all:

We are certifying an existing 10 story core and shell office building, with up to 4 tenants per floor. It is not clear how many indoor air measurements (...

Last reply: CBRE Sustainable Building Advisory, Jul 4, 2019, 4:57 pm

TVOC and CO2 Testing Recommendations for Arc

Discuss the LEED Dynamic Plaque and Arc
posted by Ece Ersoz on Sep 8, 2017, 9:54 am

Hi,

We are working on a LEED Recertification project and decided to use Arc for that. My questions are: Typically, how do you perform these testings? Which protocols are more commonly...

Last reply: CBRE Sustainable Building Advisory, Jul 4, 2019, 4:46 pm

LTc7- Reduce parking footprint- examplary performamce

NC-v4 LTc7: Reduced parking footprint
posted by Maria Peralta on Jul 3, 2019, 10:27 am

Hello!  

I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street...

Last reply: Maria Peralta, Jul 4, 2019, 4:14 am

Interior Partitions Option 2: Strategy F without movable partitions?

NC-v4 EQc6: Interior lighting
posted by Cindy Quinn on Jul 2, 2019, 11:46 pm

Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions?  Our project was denied this strategy because we don't have movable...

Last reply: Dionisio Franca, Jul 3, 2019, 9:26 pm

Measurements for CO2 / TVOC

Hospitality-EBOM-v4.1 EQc1: Indoor Environmental Quality Performance
posted by Denaye Hinds on Jul 3, 2019, 5:51 pm

Where should these measurements be taken throughout the property/building and how many per zone are required?  

TRACE 700 Performance Report- Optimal

NC-v4 EAp2: Minimum Energy Performance
posted by Mark Norris on Jul 3, 2019, 4:44 pm

Good Afternoon, 

I'm working on the VA-Fresno Mental Health Center Expansion (Project # 1000104659). We're asked to upload a Minimum Energy Performance Calculator. Our TRACE energy report...

Last reply: Waleed AlGhamdi, Jul 3, 2019, 5:09 pm

Occupancy date for Core and Shell

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Edgar Arevalo on Jul 3, 2019, 3:19 pm

Regarding the...

Baseline system efficiency

NC-v4 EAp2: Minimum Energy Performance
posted by Isabel Santos on Jul 3, 2019, 2:17 pm

Hello everyone, 

I am modeling a baseline system No. 6 - Packaged...

Option 1 Noncompliant Lights are Being Phased Out

EBOM-v4 SSc4: Light Pollution Reduction
posted by Justin Schwartz on Jul 3, 2019, 12:56 pm

Good afternoon everyone,

The LEED team I am working with is pursuing LEED...

Pilot Credit Requirment

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Maria Fiorelli on Feb 11, 2019, 11:47 am

I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation. It...

Last reply: LEED Team DC, Jul 3, 2019, 11:31 am