Quality Views in Non-Regularly Occupied Spaces Pilot

CI-v4 INc1: Innovation
posted by Juliana Moreira on Sep 27, 2017, 11:13 am

We have submitted evidence for this credit for an open plan office project in London. So far we have received positive feedback from our design preliminary review with only the filling out of the...

Last reply: Adriana Hansen, Jul 25, 2019, 2:26 pm

Ice Makers/Energy Star Compliance

NC-v4 WEp2: Indoor water use reduction
posted by Brendan Isard on Apr 18, 2017, 9:39 am

We have a project that uses water cooled ice machine, but the coolant for the system is provided through a refrigerant through a closed loop system. The production for the ice maker also meets...

Last reply: emily reese moody, Jul 25, 2019, 1:38 pm

ISO 16346:2013

Pilot-Credits EApc95: Alternative Energy Performance Metric
posted by Emmanuel Pauwels on Jan 27, 2016, 12:33 pm

Since we are unable to find greenhouse gas emission factors with a reference to ISO 16346:2014, could we use the greenhouse gas emissions factors as used by the Spanish National Institute for...

Last reply: Leanne Conrad, Jul 25, 2019, 1:09 pm

Inclusive Design Pilot Credit

Pilot-Credits INpc125: Inclusive Design
posted by Karen Mahrous on Jun 20, 2019, 4:16 pm

Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners....

Last reply: Kath Williams, Jul 25, 2019, 10:42 am

Paint Storage

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Summer on Jul 21, 2019, 5:52 am

Does paint storage room is included in the requirement of interior-cross contamination prevention requirement?

Last reply: Summer, Jul 25, 2019, 5:00 am

Precertification Before Master Site Registration

LEED Guidance for Campuses and Multiple Buildings
posted by Omer Moltay on May 16, 2012, 2:23 pm

Dear All,

In a single site there will be two buildings and we wish to implement the Master Site for their LEED certification. However, the owner wishes to have Precertification for one of...

Last reply: Summer, Jul 25, 2019, 2:34 am

Integrative Process v4.1- Project Team Letter

NC-v4.1 IPc1: Integrative process
posted by Kelli Kimura on Jul 24, 2019, 3:09 pm

Hello,

I wanted to clarify when the Project Team Letter should be completed for the v4.1 IP credit. The credit language says the letter should, "Describe the approach developed by the...

Recommened software for doing the Interior and Daylighting analyses.

NC-v4 EQc7: Daylight
posted by Jorng-ren Chern on Apr 10, 2018, 2:05 am

in the Forum.  Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up...

Last reply: Zahra Mirian, Jul 24, 2019, 4:53 pm

IEQc8.1 Required Information

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Victoria Rios Esteve on Jul 24, 2019, 4:04 pm

Hi everyone! 

We are close to upload the construction submittal on a project we are working on. On this credit, we were planning to upload Supplemental Daylight and Views Calculation...

IEQc6.1 Required Information

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Victoria Rios Esteve on Jul 24, 2019, 4:01 pm

Hi everyone! 

We are close to upload the construction submittal on a project we are working on. We were planning to upload representative drawings/floorplans identifying the lighting...