Log in
Forum
Topic

Lighting Control in blood draw spaces

Healthcare-v4 EQc6: Interior lighting
posted by Heather Belsey on Mar 11, 2024, 3:56 pm

For the lighting credit you need to have individual controls at 90% of patient positions.  LEED defines patient positions as:

A patient bed, infusion chair, recovery...

Green walls

NC-v4 SSc3: Open space
posted by Santiago Avila on Mar 11, 2024, 10:44 am

Hello everybody,

I would like to confirm if green walls counts as green area for open spaces, clarly without any artificial/fake plants. 

EPD of aluminium systems

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Mary Brown on Mar 11, 2024, 4:34 am

Hello everybody, I have a question regarding the necessity for EPD concerning aluminium profile or aluminium system to a LEED project.

Regading aluminium systems (eg aluminium window),...

Last reply: Michelle Bombeck, Mar 12, 2024, 11:43 am

Commissioning near end of construction

NC-v4 EAp1: Fundamental commissioning and verification
posted by Nadia Azzam on Mar 7, 2024, 10:37 am

We have been handed over a project aiming for LEED Gold that was delayed due to COVID and previously managed by a different LEED admin who has since left the company. After reviewing the...

Last reply: Dave Hubka, Mar 8, 2024, 9:33 am

Commercial Kitchen Query

CI-v4 EAp2: Minimum Energy Performance
posted by padma priya on Mar 7, 2024, 6:30 am

In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. 

Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am

Enhanced Refrigerant Management Query

EBOM-v4 EAc8: Enhanced Refrigerant Management
posted by padma priya on Mar 7, 2024, 4:16 am

We have a VAM Chiller, and we indicated "none" as the refrigerant type because in VAM chillers, water serves as the refrigerant, resulting in zero OWP and...

Last reply: Dave Hubka, Mar 9, 2024, 11:42 pm

Partial Floor LEED Certification

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 7, 2024, 12:14 am

I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified.  The project space is approximately 52% - 60% of the total floor area, but it...

LEED Communities- non-contiguous land included

ND-v4 MPR2: Must use reasonable LEED boundaries
posted by Lidia Johansen on Mar 5, 2024, 6:21 pm

Eliot Allen LEED AP-ND, Principal Criterion Planners LEEDuser Expert 303 thumbs up March 5, 2024- 6:42 pm Lidia, you're correct there's no LEEDuser forum for Communities despite its official status. I'm unaware of non-contiguous land provisions in Communities, but it may not be a good idea to look toward ND because the two systems were developed very differently. ND doesn't allow non-contiguous land, except for intervening street rights-of-way. For Communities, you may want to check with USGBC staff. Eliot Log in or register to post comments Lidia Johansen Principal...

Last reply: Lidia Johansen, Mar 6, 2024, 4:21 am

Backup Documentation

NC-v4 WEc4: Water metering
posted by Michelle Rosenberger on Mar 5, 2024, 11:09 am

is requested by the LEED Online credit template.  would be insterested to hear from others on this forum with respect to 'what to upload onto LO platform?'. good post! Log in or register to post...

Last reply: Karen Joslin, Mar 5, 2024, 12:27 pm

Consideration of Manmade Ponds in Protect or Restore Habitat Credit Calculations.

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Subhashkumar A on Mar 4, 2024, 12:42 pm

In one of our project, the site includes man-made ponds, which are used as rainwater storage ponds. For the calculation of the protect or restore habitat credit, can I include this pond area in...

Last reply: Bryna Dunn, Mar 4, 2024, 3:46 pm