v2009: Design Submittal doubtsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Victoria Rios Esteve on May 10, 2022, 7:17 am
Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30. We have 2 main... |
|
Two contracts one for demo and one for renovation-Construction and Demo Waste wLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Karen Zelenka on Apr 28, 2022, 1:49 pm
Can I register the project to look a LEED points after demo. The project wants to demo the interior (some exterior) of an existing building but not do LEED required... |
|
Change awarded credit after Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Maria Peralta on Mar 2, 2022, 4:59 pm
A client has earned enough points for LEED Gold in the end of the construction phase. As there is margin, he comments that he prefers not to fulfill an awarded credit. Is it possible to make an... Last reply: Marcus Sheffer, Mar 2, 2022, 5:43 pm |
|
Certification ProcessLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Luisa Scambia on Nov 26, 2021, 9:38 am
Hello LEEDUsers, Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
|
|
LEED Online and Adobe Reader DC- Adobe Reader 11 is end of lifeLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Kerry Dixon on Nov 7, 2017, 12:00 pmOnline Status Updates forum- https://leeduser.buildinggreen.com/tipsheet/leed-online-status-updates. To keep them in the loop, I will direct readers of that forum to this discussion but you might find... Last reply: emily reese moody, Nov 4, 2021, 11:36 am |
|
Source for Table 1 Maximum ParametersLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by indian tantrik on Aug 16, 2021, 9:46 am
Source for Table 1 Maximum Parameters |
|
Extension for reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Lawrence Lile on Aug 6, 2014, 5:55 pm
We have had a preliminary review comment that highlights a missed prerequisite. We will require more than the 25 days allowed for our response. I understand we can ask for an extension, but... Last reply: emily reese moody, Jul 8, 2021, 12:22 am |
|
Design SubmittalLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Aaron Kennedy on Jun 4, 2021, 3:37 pm
We are finishing up the design submittal to submit for review, but I cannot find where the overall plans are supposed to be submitted? Am I missing it somewhere or Is there not a place to submit... Last reply: Deborah Lucking, Jun 4, 2021, 4:08 pm |
|
Error with LEED Online Design Review SubmissionLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Stefen M on May 31, 2021, 5:19 am
Hello, Unfortunately in our attempts to submit for a LEED design review today- the LEED Online submission system has yielded a number of errors which are documented below. Screenshots are... Last reply: Stefen M, Jun 1, 2021, 10:04 pm |
|
Construction related credits in a LEED Design submission (LEED Online process)LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Stefen M on Apr 21, 2021, 7:16 pm
Hi all, Last reply: Stefen M, Apr 27, 2021, 12:13 am |