Energy modeling for an industrial facility

NC-2009 EAc1: Optimize Energy Performance
posted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:34 am

I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the...

SS- EM

NC-2009 EAc1: Optimize Energy Performance
posted by Nikhil Kumar on Feb 19, 2017, 10:19 am

Dear All,

I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8. VRF has...

Last reply: Marcus Sheffer, Feb 19, 2017, 12:24 pm

Utility Rate

NC-2009 EAc1: Optimize Energy Performance
posted by Alice chen on Jan 19, 2017, 6:05 am

Hi All,

I am working on a LEED 2009 project based in Europe. I just wonder shall I use the latest utility rate in 2016 or the old one in 2010? Shall I put Dollars or Euro in the model?...

Last reply: Marcus Sheffer, Jan 19, 2017, 9:21 am

Proposed case cooling capacity reducing energy savings

NC-2009 EAc1: Optimize Energy Performance
posted by Nikhil Kumar on Jan 19, 2017, 5:35 am

Hi,

I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP. Auto sized as per ASHRAE.

In proposed case, VRF System used with...

Last reply: Marcus Sheffer, Jan 19, 2017, 9:11 am

Existing Building Baseline Inquiry

NC-2009 EAc1: Optimize Energy Performance
posted by Scott Glancy on Jan 11, 2017, 2:11 pm

The project consists of upgrading a liquid helium (LHe) to gaseous helium (GHe) conversion and compression system. This type of system falls under “other load category” and according to table G3....

Last reply: Marcus Sheffer, Jan 18, 2017, 12:12 pm

EApc95- Alternative Energy Performance Metric questions

NC-2009 EAc1: Optimize Energy Performance
posted by Jamy Bacchus on Nov 11, 2016, 4:15 pm

This pilot credit includes a XL file with tables B through H to calculate savings in terms of GHGs, site energy, source energy, energy cost,...

Last reply: Jamy Bacchus, Nov 22, 2016, 1:15 pm

n/a

NC-2009 EAc1: Optimize Energy Performance
posted by SAMY Chamy on Jan 28, 2016, 12:25 pm

SAMY Chamy Enginneer T&T Green LEEDuser Basic Member 12 thumbs up January 29, 2016- 10:44 am Awaiting for ur reply Log in or register to post comments Tristan Roberts Technical Director The Laurentia Project, HPDC LEEDuser Expert 11456 thumbs up January 29, 2016- 11:00 am Samy, Marcus and others volunteer a huge amount of time on this forum. Please be patient—you may not get an answer within hours or days. If a question does not get answered, please consider simplifying it or doing more research on your own.Also please understand that experts like Marcus are often hired as consultants on LEED...

Last reply: Victoria Watson, Oct 18, 2016, 12:51 pm

Compliance Documents for EAp2 and EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by Alice chen on Oct 12, 2016, 6:08 am

Hi all,

I am working on my first LEED modelling work with IES and wondering what documents are needed for the submission for EAp2 and EAc1. I suppose it should include 1) BPRM Report from...

Last reply: Cory Duggin, Oct 12, 2016, 11:14 am

Counting RECs Towards EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by Waleed AlGhamdi on Sep 20, 2016, 6:31 pm

Hello,

We have a project that is part of a campus and has a significant PV array that offsets about 35% of the building's energy costs. However, the generated electricity does not go...

Last reply: Waleed AlGhamdi, Sep 26, 2016, 12:52 pm

German Energy Saving Law Certificate as Submittal

NC-2009 EAc1: Optimize Energy Performance
posted by Dandan Li on Aug 26, 2016, 11:52 am

Hello all,
We have a LEED v2009 C&S project in Germany now. LEED asks for energy simulation according to ASHRAE Standard for the Prerequisite Minimum Energy Performance and Credit...

Last reply: Marcus Sheffer, Aug 31, 2016, 3:25 pm