Topic | Recent |
---|---|
Minisplit EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Sep 28, 2020, 2:16 pm
Hi I am certifiying an office building, a very small one, attached to a wharehouse. The office building counts with minisplit systmes, but I cannot find in the market minisplits... Last reply: Paula Hernandez, Sep 30, 2020, 9:50 am |
|
Campus project- District heating/coolingNC-2009 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Sep 29, 2020, 6:00 pm
Hi all, We are working on a campus project that includes two separate buildings and a master site. Both buildings would be served by boilers and chillers that are located in the basement... |
|
Minisplit EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Sep 28, 2020, 1:58 pm
Hi I am certifiying an office building, a very small one, attached to a wharehouse. The office building counts with minisplit systmes, but I cannot find in the market minisplits... |
|
Ventless equipment in commercial application questionNC-2009 EAp2: Minimum Energy Performanceposted by Michelle McConnell on Jun 19, 2020, 9:07 am
Do ventless dishmachines or ventless cooking equipment provide for leed points? If so, how? Last reply: Marcus Sheffer, Jun 26, 2020, 9:06 am |
|
Sports Field Lighting (Flood lights)NC-2009 EAp2: Minimum Energy Performanceposted by Ameet AA on Feb 28, 2013, 5:57 amLEEDuser Expert 5796 thumbs up June 10, 2020- 1:07 pm I would suggest you post your question in the forum for the Light Polution credit. Log in or register to post comments ... Last reply: Marcus Sheffer, Jun 10, 2020, 1:07 pm |
|
ASHRAE 2007 G 3.1.1 Exception BNC-2009 EAp2: Minimum Energy Performanceposted by on May 23, 2020, 11:29 am
I am working on a retail project with three restaurant spaces. I got a comment below from the LEED reviewer. "The General HVAC and Air-Side HVAC tabs indicate that system type 6: Packaged... Last reply: Cam Fitzgerald, May 26, 2020, 2:50 pm |
|
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009NC-2009 EAp2: Minimum Energy Performanceposted by Susan Di Giulio on Apr 8, 2020, 2:17 pm
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's... Last reply: Marcus Sheffer, Apr 10, 2020, 4:29 pm |
|
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009NC-2009 EAp2: Minimum Energy Performanceposted by Susan Di Giulio on Apr 8, 2020, 2:34 pm
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's... Last reply: Marcus Sheffer, Apr 8, 2020, 7:46 pm |
|
Energy modeling, Chiller at AHRI conditionsNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Sánchez Sánchez on Mar 10, 2020, 1:17 pm
Hi, I’m modeling a building which has water-cooled chillers. It comes down that the provider has sent us the chiller specs, and the chiller efficiency was tested at no AHRI... Last reply: Tyler Thumma, Mar 25, 2020, 3:15 pm |
|
Baseline ChillersNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Sánchez Sánchez on Mar 12, 2020, 4:27 pm
Greetings, We are working on a large project which has 10 customized Chillers each chiller over 2,000 tons. When I model the baseline, the total cooling capacity is... Last reply: Marcus Sheffer, Mar 13, 2020, 10:26 am |