Lift Cycle AnalysisCS-v4 MRc1: Building life-cycle impact reductionposted by Guillaume Rose on Nov 8, 2019, 11:11 am
Hello, When i read the leed v4 referential, we see that for the life cycle analysis, only the products that are measured with surface calculation are taken into account in the calculation... |
|
FRANCE PROJECTPassive House Discussion Forumposted by Mélanie Bouchenez on Oct 11, 2019, 6:39 am
Hello, I work on LEED projects in France. The LEED repository specifies when the requirements can respect local standards. Is there a list of French local standards accepted by the USGBC... |
|
PUE calculationData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Marion THIBAULT on Jul 19, 2019, 5:14 am
Dear LEED user, Someone could tell me, the value that i have to compare to the... Last reply: Tyler Thumma, Sep 12, 2019, 1:45 pm |
|
Building a new hotel in extension of an old oneLEED Rating System Selectionposted by Marion Touaux on Jul 17, 2019, 6:52 am
Hi, I am a bit confused regarding which rating system I should register a project into. The project is to build a new hotel right (about 50 keys) next to an existing... Last reply: Michelle Rosenberger, Jul 19, 2019, 2:38 pm |
|
Calculation methodologyData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Marion THIBAULT on Jul 2, 2019, 8:51 am
We are currently carrying out a DATA CENTER in France for which we aim for a LEED certification. We have some problems interpreting the EAp1 requirement and perhaps you can help us answer our... |
|
Size of shower and changing facilitiesData-Centers-NC-v4 LTc6: Bicycle facilitiesposted by Marion THIBAULT on Jun 27, 2019, 8:42 am
Hi, Do we have minimum requirements for the size and configuration of changing facility shower ? Thanks |
|
Bicycle racks distanceCS-v4 LTc6: Bicycle facilitiesposted by Guillaume Rose on May 28, 2018, 5:41 am
Hi, In my Project, there are 2 bicycle areas : - 1 at the same level as the entrance but the distance is more than 30 meters - 1 in the basement, but a lift dedicated to... Last reply: Emily Purcell, Mar 27, 2019, 9:57 am |
|
Green electricityCS-v4 EAc7: Green power and carbon offsetsposted by Guillaume Rose on Jan 8, 2019, 5:12 am
Hi, I work on a 100% electric project. The owner will subscribe to a 3 year contract with a company that provide a 100% green electricity. On this contract it's specified it will... Last reply: Marcus Sheffer, Jan 8, 2019, 10:58 am |
|
option 1: No irrigation and rainwaterCS-v4 WEc1: Outdoor water use reductionposted by Guillaume Rose on Dec 11, 2018, 9:57 am
Hi, I would like to know if i can get the points of "option 1 : no irrigation required" if i have no irrigation system on my landscape area but, i use the stored rainwater to water the... Last reply: Dave Hubka, Dec 11, 2018, 10:48 pm |
|
Option 3. building and material reuseCS-v4 MRc1: Building life-cycle impact reductionposted by Guillaume Rose on Dec 10, 2018, 9:01 am
Hi, I would like to know how to count the surface of material reused. For exemple, in my project, on the floor, i have a subfloor with carpet on it. I have to count the surface of... Last reply: Tristan Roberts, Dec 10, 2018, 2:48 pm |