Log in
Forum » United Arab Emirates
Loading...
Topic

Indoor unit power calculation

NC-2009 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on Nov 21, 2017, 9:09 am

Hi,

I am doing Energy Model for car showroom which is LEED Gold Rating. Proposed HVAC System is Packaged Units and Split units. I have received the EER, Total Cooling capacity, sensible...

Last reply: Marcus Sheffer, Nov 21, 2017, 1:33 pm

Parking Garage (VFD with CO sensor) exceptional calculation Method

NC-2009 EAp2: Minimum Energy Performance
posted by Manivel Natarajan on Nov 13, 2017, 4:35 am

Hi Team,

Greetings!

The project has propsoed one of the...

Last reply: Chilufya Lombe, Nov 14, 2017, 2:30 am

How many points can be claimed if project is served with 100% Renewable Energy for EAC1?

NC-v4 EAc2: Optimize Energy Performance
posted by Ashraf Ali Khan Khan on Nov 9, 2017, 11:23 am

How many points can be claimed if project is served with 100% Renewable Energy?

For LEED V4 NC, we need to demonstrate 5% of Energy Savings compared to ASHRAE Baseline through Energy...

Last reply: Marcus Sheffer, Nov 10, 2017, 1:35 pm

LEED CS V4 Design of Snow park

CS-v4 EAp2: Minimum Energy Performance
posted by Shahana Sayed on Oct 16, 2017, 7:55 am

What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE.

Last reply: Marcus Sheffer, Oct 18, 2017, 10:31 am

LEED CI V4 Energy Model, 2 Floors

CI-v4 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on Sep 13, 2017, 2:02 pm

Hi,
I am doing the energy simulation for LEED CI v4 Rating. There are 5 buildings named as Block 1,2,3,4&5 in the site and all buildings are conditioned by the centralized air cooled...

Last reply: Marcus Sheffer, Sep 25, 2017, 11:01 am

Mechanical Equipment Finishes

NC-v4 EQc2: Low emitting materials
posted by Samer Alhmdan on Aug 7, 2017, 6:24 am

Hello,

Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes.

Last reply: Ashwini Arun, Sep 12, 2017, 1:48 pm

Minimum Indoor Air Quality Performance Calculation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Amal Venugopal on Jul 4, 2017, 7:53 am

My Project has one FAHU on roof which is supply treated Fresh air to all...

Last reply: Christopher Schaffner, Aug 31, 2017, 2:23 pm

LEED CI v3- Ofice- Energy Model. Please Advise

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nikhil Kumar on Aug 14, 2017, 7:29 am

Hi,
I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+M+3 Floors. Our tenant spaces are located in 1st Floor. Tenant’s spaces are conditioned by...

Last reply: Marcus Sheffer, Aug 23, 2017, 2:08 pm

Applicability within campus boundary limits

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Samer Alhmdan on Jul 25, 2017, 2:59 am

Hello,
I have multiple buildings within a campus, do we need to implement this prerequisite within the whole campus boundaries, or only within buildings LEED boundaries, noting that there...

Last reply: Trista Little, Jul 25, 2017, 6:47 pm

Data Sheet or Laboratory test report?

NC-v4 SSc5: Heat Island Reduction
posted by Samer Alhmdan on Jul 20, 2017, 8:46 am

Hello,

Do we need a laboratory test report to substantiate the...

Last reply: Trista Little, Jul 20, 2017, 12:37 pm