Log in
Forum » Saudi Arabia
Topic

Campus Thermal Energy System- Multiple Buildings

NC-v4 EAp2: Minimum Energy Performance
posted by Senna Sabir on Dec 25, 2019, 4:00 am

Hello,

We are working on a campus project that contains multiple NC and F&B CS buildings. We'll be registering the master site and the individual buildings under the campus approach. A...

Last reply: Tyler Thumma, Feb 14, 2020, 8:25 am

Project Name maximum character limit

Living with LEED Online - quirks, bugs and hiccups
posted by Manivannan Devaraj on Jan 21, 2020, 3:35 am

What is the maximum character limits for Project Name character

Last reply: Bill Swanson, Jan 21, 2020, 10:39 am

7.6.1.2 Extracting Fan Power – Baseline Design

NC-v4 EAc2: Optimize Energy Performance
posted by Amal Venugopal on Nov 4, 2019, 8:59 am

Hi Sir,

Greetings!

The following content is copied from,

Page No,38 of...

Last reply: Tyler Thumma, Dec 20, 2019, 11:01 am

ASHRAE 90.1.2010 Mandatory & Prescriptive Requirements vs Energy Model

CI-v4 EAc2: Optimize Energy Performance
posted by SSN Energy Model on Oct 9, 2019, 9:57 am

Hi to all,

I am doing energy model for one of our LEED CI Project under v4 rating system. 

The following contents are copied from reference guide,

Option 1. Tenant-level...

Last reply: Marcus Sheffer, Oct 11, 2019, 10:17 pm

Can consider the air cooled chiller yard as central plant

CI-v4 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Oct 9, 2019, 10:23 am

Hi to all,

Greetings!

I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4.

The baseline system should be System 8 (...

Last reply: Marcus Sheffer, Oct 11, 2019, 9:50 am

Commissioning Documentation for 7 separate towers sharing a common ground floor & podium level with shared/mixed MEP Systems

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Joshua ADY on Mar 10, 2019, 6:24 am

We are working as an independent...

Last reply: Scott Bowman, Aug 11, 2019, 6:23 pm

VOC Limit for opaque paints for wood.

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Suhas Kurikkal on May 1, 2019, 9:26 am

We have opaque flat paint to be applied for the decorative...

Last reply: Michelle Rosenberger, May 2, 2019, 12:10 pm

Zero Lot line Plot and Option 2 Scenario

NC-v4 SSc4: Rainwater management
posted by Boobalan Saravanan on Apr 3, 2019, 1:22 am

Hi all.

I am working on a project which falls under a zero lot line. Option 1 says everything needs to be done in the design stage and the runoff needs to be managed, which was not done in...

EWH ASHRAE Compliance

NC-2009 EAc1: Optimize Energy Performance
posted by Osama Touni on Mar 24, 2019, 6:09 am

Hi 

Regarding Electric water Heater, is there any equation to calculate the EWH energy factor to compare the result with the equation of ASHRAE 90.1-2007...EFmin = 0.97* − (0.00132 × V...

Last reply: Marcus Sheffer, Mar 26, 2019, 9:56 am

Heat Exchangers

NC-2009 EAp2: Minimum Energy Performance
posted by Osama Touni on Feb 20, 2019, 6:40 am

Greetings,

how can i confirm that the proposed Heat exchangers comply with LEED EAp 2 minimum energy performance ? and what is the requirement of ASHRAE 90.1.2007  fro the same material...

Last reply: Marcus Sheffer, Feb 20, 2019, 12:01 pm