Process LoadNC-2009 EAc1: Optimize Energy Performanceposted by Muzammal Abbas on Aug 18, 2015, 3:06 am
Dear all, Last reply: Marcus Sheffer, Aug 18, 2015, 9:10 am |
|
Open space definitionNC-2009 SSc5.2: Site development - maximize open spaceposted by sompoche sirichote on Apr 20, 2015, 5:00 am
My project is in the industrial area which allows building footprint not exceeding 66% of total site area. So, it means at least 34% of total site area belongs to opening space including roads,... Last reply: Ellen Mitchell, Apr 22, 2015, 3:02 pm |
|
Basic Services Provided by the ClientNC-2009 SSc2: Development Density and Community Connectivityposted by Keerthi Ratnayake on Mar 11, 2015, 1:50 am
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers. This was an abandoned place and no basic services available. Last reply: Michelle Robinson Schwarting, Mar 12, 2015, 11:06 am |
|
Project boundary issuesHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Muneeb Haider on Feb 17, 2015, 12:14 am
I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site. The site has two entrances flanked by guard rooms, a prayer area, storage... |
|
Is APPENDIX NeededNC-2009 IEQp1: Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on Feb 3, 2015, 9:06 am
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we... |
|
Energy modelingCI-2009 EAc1.3: Optimize energy performance - HVACposted by Muzammal Abbas on Dec 1, 2014, 12:35 am
Dear Sir, Last reply: Marcus Sheffer, Dec 1, 2014, 10:07 am |