Log in
Forum » Colombia
Topic

Core Learning Space implies use School LEED requirements?

LEED Rating System Selection
posted by MKK LEED on Dec 11, 2014, 10:10 am

Hi All,

I’m working in a LEED project that will be a building for the training of teachers, It is planned to have conferences, meetings and there will be ‘’laboratories’’ that is more a...

Last reply: Tristan Roberts, Nov 27, 2015, 3:35 pm

Emission Reporting (ISO 14064/ Portfolio Manager)

EBOM-2009 EAc6: Emissions Reduction Reporting
posted by Esteban Martinez on Nov 24, 2015, 9:34 am

Hi,

We are working in a project in Colombia. Can we use ISO 14064 certificated (Greenhouse gases) to document...

Last reply: Michael Smithing, Nov 24, 2015, 8:03 pm

Section 6.4.1.2, crossed ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on Nov 11, 2015, 7:48 pm

I don't know how to interpret the following section of ASHRAE 62.1-2010:

"6.4.1.2. Double side openings. For spaces with operable openings on two opposite sides of the space, the maximum...

Last reply: Gustavo De las Heras Izquierdo, Nov 13, 2015, 6:49 pm

n/a

CS-2009 IEQp1: Minimum IAQ Performance
posted by Alan Viale on Nov 5, 2015, 12:11 pm

Dear all,
We are working on a mall with natural ventilation on the common areas (corridors). As this is not a regularly occupied zone, can I take air from this spaces to comply with the...

One single building

NC-2009 PIf1: Minimum Program Requirements
posted by MKK LEED on Oct 8, 2015, 1:15 pm

We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203...

Last reply: Gustavo De las Heras Izquierdo, Oct 22, 2015, 1:40 am

Energy Star Alternative

Retail-CI-v2009 EAp2: Minimum Energy Performance
posted by Juan Morales on Sep 17, 2015, 5:31 pm

A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?

Baseline ventilation rates

NC-2009 EAp2: Minimum Energy Performance
posted by TOMAS URIBE on Aug 24, 2015, 5:44 pm

When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%?
I am working in LEED V2009. ASHRAE 90.1-2007

Last reply: Marcus Sheffer, Aug 25, 2015, 1:26 pm

IDF curves

NC-2009 SSc6.1: Stormwater design - quantity control
posted by MKK LEED on Oct 23, 2014, 12:19 pm

Hi,
I have a NC project in Colombia and the Environmental Authority just have IDF curves since 3 years. I don't have information since 1 and 2 years. Can I use the value for 3 years in...

Last reply: Gustavo De las Heras Izquierdo, Jul 22, 2015, 2:55 pm

New purchases Energy Star

Retail-CI-v2009 EAp2: Minimum Energy Performance
posted by Juan Morales on May 21, 2015, 12:51 pm

In the EAp2 and EAc1.4 for LEED CI v2009, you established that projects may include only new equipment and appliances purchased for the LEED-CI scope of work in the list for Energy Star rated...

Last reply: Geraldine Assmus, Jun 25, 2015, 11:22 am

cxa requirements

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by andres ramirez on Nov 25, 2014, 2:30 pm

Hi I’m an arquitect and I just got the CPMP-...

Last reply: Scott Bowman, Mar 19, 2015, 6:16 pm