n/a

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Anastasia Makarenko on Nov 6, 2015, 4:07 am

Hello all,
I am confused how to identify one product that is going to be used on a concrete slab inside our project building. This is some kind of sealer used to protect concrete from water...

Last reply: Tristan Roberts, Nov 27, 2015, 3:29 pm

Air cleaning for IEQc3.1 Construction IAQ management plan

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Marina Radchenko on Nov 4, 2015, 5:21 pm

We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction:
- no natural ventilation
- no ventilation by permanent...

Last reply: Tristan Roberts, Nov 27, 2015, 3:20 pm

Glazing cover of parking area

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Nina Starynina on Oct 14, 2015, 10:31 am

Hi,
The project has a covered parking. The Owner is chosing the cover material and considers to implement glazing for the cover (...

Last reply: Tristan Roberts, Nov 26, 2015, 10:03 pm

VRP Compliance Calculator

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Nov 13, 2015, 5:39 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5530 thumbs up November 13, 2015- 3:02 pm Sounds like this question belongs in the IEQp1 forum instead of the EAp2 forum. Log in or register to post comments ...

Last reply: Marcus Sheffer, Nov 13, 2015, 3:02 pm

Baseline modeling for manufacturing facility

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Oct 26, 2015, 2:04 am

Hi Markus and colleagues,
There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling.
The project in question is a...

Last reply: Vassil Vassilev, Oct 27, 2015, 2:04 am

distance between shower rooms and changing rooms

CI-2009 SSc3.2: Alternative transportation - bicycle storage and changing rooms
posted by Anastasia Makarenko on Sep 17, 2015, 10:04 am

We currently have a project LEED-CI. It's an office in which there are 4 shower rooms for 730...

Last reply: Anastasia Makarenko, Sep 18, 2015, 2:43 am

Rideshare and Company Shuttles

NC-v4 LTc5: Access to quality transit
posted by Amanda Johnson on Jul 16, 2015, 6:39 am

Hi,
With the new frequency requirement I am not sure how Company shuttles (that are related to set workshifts and which only operate 8 times a day) would fit into this?
The shuttle...

Last reply: Tristan Roberts, Sep 16, 2015, 3:54 pm

Several separate baseline HVAC systems on one floor.

NC-2009 EAp2: Minimum Energy Performance
posted by Nina Starynina on Aug 25, 2015, 10:05 am

Hello colleagues,
I have a question from our energy modelling team. The question is about baseline HVAC systems modelling.
ASHRAE 90.1, appendix G, point G3.1.1 requires modelling...

Last reply: Nina Starynina, Sep 1, 2015, 2:45 am

Densely occupied spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Aug 21, 2015, 9:13 am

Hi Markus,
I'd like to ask you for your opinion and advice about applying these values following the case described below.

In LEED glossary such spaces are determined as 25 people...

Last reply: David Hubka, Aug 21, 2015, 12:55 pm

Data Center systems in Baseline

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Mar 9, 2015, 3:08 pm

Greetings everybody

I'm modeling a datacenter at the moment and there few issues I'm wondering how to proceed.
The project consists of two building adhered to each other. The floor...

Last reply: Rajesh Balachander, Jun 4, 2015, 2:00 am