Zero lot line projectsNC-v4 SSc4: Rainwater managementposted by Gustavo De las Heras Izquierdo on Mar 26, 2015, 12:47 pm
Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations. Am I reading this... Last reply: Dave Hubka, May 16, 2022, 2:10 pm |
|
Safety-first measure duration and recurrence of survey applicationPilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Malenny Jimenez on Mar 18, 2022, 2:11 pm
My team would like to know if there is a lenght of time for which these requirements are to be complied. Is this credit thought out specifically for the COVID pandemic or is it intended to be... Last reply: Agnes Vorbrodt, May 9, 2022, 1:23 pm |
|
Outdoor water use minimum requirementsCS-v4 WEp1: Outdoor water use reductionposted by Gabriela Mena on Oct 1, 2018, 11:21 am
Hi, We are developing a CS project, even that the project is not pursuing the minimum percentage required for open space and vegetated areas, it has some pots. In order to... Last reply: Andrey Kuznetsov, Apr 1, 2022, 2:42 am |
|
Negative EToCS-v4 WEp1: Outdoor water use reductionposted by Laura Chávez on Jul 13, 2020, 8:15 pm
I'm using the Outdoor water use reduction calculator_v02 from the resources tab since the project its outside USA. I'm entering the data for the monthly rainfal and Monthñy ETo from the IWMI site... Last reply: Andrey Kuznetsov, Mar 30, 2022, 10:10 am |
|
Rammed Aggregate PiersLEED v4.1 Discussion Forumposted by Oliver Preuss on Dec 24, 2021, 2:03 pm
Hi everyone, we are participating in a porject in Mexico where the client wants to use Rammed Aggregate Piers, and we want to use this oportunity to get some points for the New Construction, but... |
|
INPc136: Safety First- Re-Enter your WorkspaceCS-2009 IDc1: Innovation in Designposted by Juan Guerrero on Oct 27, 2021, 11:10 am
Hello everyone, Does anybody know if this pilot credit will be an actually credit? In the time we are living, I imagine this will be part for our lives for now on to the future. |
|
IDc1.4 Bird Collision DeterrenceCS-2009 IDc1: Innovation in Designposted by Juan Guerrero on Oct 27, 2021, 10:34 am
Hi everyone, I have a question about the IDc1.4 Bird Collision Deterrence credit. What relevance do metal doors and walls have for bird collisions? |
|
Daylight controls in multifamily mid-rise residential buildingsNC-v4 EAp2: Minimum Energy Performanceposted by Gaston Michaud on Oct 26, 2021, 12:54 pm
Hi, By following the Multifamily Energy Model Simulation Guidelines, lighting in dwelling unit spaces shall be modeled as lit for 2-3 hours per day; so, we distributed these hours ... Last reply: Marcus Sheffer, Oct 26, 2021, 2:00 pm |
|
INpc136- Daily Journal Further SpecificationsPilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Frida Villa on Sep 22, 2021, 3:36 pm
Is there a requirement/recomendation on how long the daily survey needs to be applied for? The requirements under the credit are not very specific when it comes to the daily journal, what do you... Last reply: Vladimir Mota, Oct 13, 2021, 9:22 pm |
|
INPc136: Safety First- Re-Enter your WorkspaceCS-2009 IDc1: Innovation in Designposted by Juan Guerrero on Oct 11, 2021, 2:08 pm
Hi everyone, We have a dout about the photos we need to take for this credit. Can we just take pictures of the signals for the covid rstrictions? Or do we need to thake... |