Log in
Forum
Loading...
Topic

LEED AP NC applicable?

Hospitality-NC-v4 INc2: LEED Accredited Professional
posted by Maria Perzon on Jan 17, 2020, 3:12 am

I am a LEED AP for NC. Would that qualify for 1 credit in the hospitality version. The project is a hotel. 

Last reply: Trista Little, Jan 17, 2020, 11:45 am

Project in a resort attached to casino that allows smoking

NC-v4 EQp2: Environmental tobacco smoke control
posted by Anna Kaelin on Jan 10, 2020, 12:47 pm

I have a client planning a complete fit-out of one of their retail spaces. The project is located in a resort in Las Vegas, which is attached to a Casino that allows smoking. Smoking is...

Last reply: Trista Little, Jan 17, 2020, 11:42 am

v4.1 Low-Emitting Calculator??

NC-v4.1 EQc2: Low-emitting materials
posted by Sara Greenwood on Jun 21, 2019, 5:34 pm

Does anyone have access to a v4.1 low-emitting calculator? Since some categories are now quantified by cost, volume, or square footage it warrants a different calculator.

Last reply: Amanda Lang, Jan 17, 2020, 11:41 am

Bicycle path width

CS-v4 LTc6: Bicycle facilities
posted by Agata Mozer on Nov 2, 2018, 6:09 am

Next to our project there is a city network of bicycle paths (marked lanes on a pavement) leading to many diverse uses and rapid transit stops. The Investor is also planning to provide...

Last reply: Agata Mozer, Jan 17, 2020, 8:53 am

LCA Inputs and Impact Measures

NC-v4 MRc1: Building life-cycle impact reduction
posted by Yaya Jashri on Dec 20, 2019, 11:57 pm

Hello,

The LEED V4 Guidebook said "For LEED, the project team must take into account the entire building...

Last reply: Bipin Karki, Jan 17, 2020, 7:34 am

LEED AP NC applicable?

Mid-Rise-v4 INc2: LEED Accredited Professional
posted by Maria Perzon on Jan 17, 2020, 3:13 am

I am a LEED AP for NC. Would that qualify for 1 credit in the mid-rise homes version. 

Monitoring NOT req if ventilation systems are not within scope of work?

CI-v4 EQp1: Minimum indoor air quality performance
posted by RDK E&S on Nov 27, 2019, 1:12 pm

I'm wondering if my understanding of the ID+C reference manual (pg 311) is correct: no airflow monitoring equipment is needed if the ventilation system isn't in the scope of work? Has anyone...

Last reply: Allen Cornett, Jan 16, 2020, 5:11 pm

Exemplary Performance?

Warehouses-NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Neil Rosen on Dec 11, 2019, 12:30 pm

In version 4, 20 EPDs from at least 5 different manufacturers is required to earn 1 point.  40 EPDs from 5 different manufacturers earns exemplary performance.

In V4.1 Warehouse...

Last reply: Allen Cornett, Jan 16, 2020, 4:53 pm

Definition of "movable partitions"

NC-v4 EQc6: Interior lighting
posted by Stacey Olson on Jan 16, 2020, 4:46 pm

​​This appears obvious, but looking for sanity / /confirmation. Can you please confirm "movable partitions" exclude doors? It is a correct understanding that when calculating this credit, door...

planters on terraces

NC-v4 WEp1: Outdoor water use reduction
posted by Agata Mozer on Dec 12, 2019, 12:40 pm

Can anyone confirm if planters located on the terraces should be included in the calculations for this credit?

Last reply: Allen Cornett, Jan 16, 2020, 4:43 pm