Buildings within site but not under LEED scope

NC-v4 EQp2: Environmental tobacco smoke control
posted by Marwa Elzoghby on Mar 22, 2024, 10:44 am

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to...

JUST Certificate- Pilot Credit: Social Equity Within the Project Team

NC-v4 INc1: Innovation
posted by Alison Rosso on Aug 8, 2023, 7:39 pm

of the design team" of this Pilot credit and will submit our JUST label for a LEED v4 ID+C Project. The credit requires the following: 1. Pilot credit registration 2. LEEDuser forum participation 3. Pilot...

Last reply: Douglas Flandro, Mar 22, 2024, 10:31 am

Option 2- Carbon dioxide monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Marina Curto on Mar 8, 2019, 5:32 am

We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we...

Last reply: Afogreen Build, Mar 21, 2024, 11:47 pm

Building Envelope Commissioning

NC-v4 EAc1: Enhanced Commissioning
posted by Chris Bennett on Feb 16, 2018, 5:29 pm

Hello All, 

Has anyone gone through the process of building envelope...

Last reply: sooha ham, Mar 21, 2024, 4:09 am

Overall Feedback on Pilot Credit

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm

As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest...

Gross Floor Area

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 21, 2024, 3:09 pm

For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage.  Since...

Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Nikhita Sapuram on Aug 8, 2023, 12:03 pm

Most WBLCA software programs do not include product specific data. For a tenant improvement project would it be acceptable to use a program that only looks at environmental impacts from cradle to...

Last reply: Kate Holly, Mar 21, 2024, 2:32 pm

Exterior Illuminated Signage

EBOM-v4 MRc2: Purchasing - lamps
posted by Kristina K on Mar 21, 2024, 11:37 am

Hello,

Does this credit apply to Exterior Illuminated Signage?

Thank you

Total Material Cost

LEED v4.1 Discussion Forum
posted by Arda Buyuklu on Mar 21, 2024, 10:49 am

Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form? How is this relevant for LEED purposes, especially if it is almost always subject to...

Multi-building project- installing renewables on only 1 building

CS-v4 EAc5: Renewable energy production
posted by Shannon Oletic on Jul 5, 2023, 2:56 pm

We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach). Is it acceptable to install the rooftop solar PV system on only one...

Last reply: Shannon Oletic, Mar 20, 2024, 9:55 am