Hello LEEDuser Community,

I am working on a military project where a barrack-like building houses 192 occupants for training classes. These spaces are used only as long as the students are...

Position of the shower in the building

NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jul 7, 2020, 3:23 am

Dear all LEED users,

We have planned a shower in the building to meet LEED requirements fro this credit. However, this shower is located on the other side of the building from the main...

Last reply: Yasha Ogg, Jul 7, 2020, 6:27 pm

Requirements to meet CO2 monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Lise Dannesboe on Apr 26, 2019, 8:42 am

Hi All

Hope someone can specify the following. When the credit requires "Provide a control drawing sample showing the...

Last reply: Donald Green, Jul 7, 2020, 3:30 pm

Purchasing Lamps Innovation Credit

NC-v4 INc1: Innovation
posted by Jason Garvens on Jan 19, 2018, 12:25 pm

For the Purchasing Lamps Innovation credit the requirements section states: "Must meet the exemplary performance criteria of the base credit (an average 35 picograms per lumen hour or less)."...

Last reply: GianCarlo Greco, Jul 7, 2020, 2:58 pm

Pilot credit: Bird collision deterrence

CS-v4 INc1: Innovation
posted by Adriana Hansen on Jul 7, 2020, 2:02 pm

We believe that pilot credit Bird collision deterrence is a great challenge for warehouses and distribution centers, especially as they are often located close to green areas. Regarding the...

Adjustable luminaries tilt- Option 1 (BUG) Vs Option 2 (Calculation)

NC-v4 SSc6: Light Pollution Reduction
posted by Anna Korinkova on Jul 7, 2020, 10:52 am

Hi, 

I would like to clarify how to characterize adjustable luminaires. 

I the LEED guide, p.212 (Step 7. Gather data on luminaires, Option 2) it is written: 'Show the total lumens...

Last reply: Anna Korinkova, Jul 7, 2020, 11:31 am

buidling that is in total 9 stories- 8 stores residential can it be certified under LEED BD+C?

LEED Rating System Selection
posted by Stephan Zweig on Jun 23, 2020, 8:51 am

I have a new buidling that is in total 9 stories (ground floor + 8 floors). The ground floor is a retail and the 8 stores are residential. Can this building be certified under LEED BD C v4, or...

Last reply: Konstantina Kalliakoudi, Jul 7, 2020, 4:19 am

Special Calculation of Peak Visitors and Regular Building occupants

NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jul 7, 2020, 3:31 am

Dear all LEED users,

I'm working on a DATA CENTER Project and I have a question about the calculation of PEAK Visitors and Regular building occupants.

There is a room that is empty...

Is pc98 required to earn pc99?

Pilot-Credits IPpc99: Design for Enhanced Resilience
posted by Elizabeth Powers on Feb 12, 2020, 7:01 pm

Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit...

Last reply: Elizabeth Powers, Jul 6, 2020, 7:05 pm

Pilot Credit req's and a suggestion

Pilot-Credits SSpc55: Bird collision deterrence
posted by emily reese moody on Jul 6, 2020, 5:03 pm

Most of the posts on these Pilot Credit pages are here out of necessity to submit it for review, this one included. It would be nice if there were some way to differentiate/filter between posts...