posted by Lawrence Rennell on Oct 17, 2019, 11:32 am

I have heard that there is credit coaching available for LEED v4 credits, however, finding a way to contact this individual is on the same level as making contact with Bigfoot. Looking for input...

Last reply: Deborah Lucking, Oct 17, 2019, 12:15 pm

Internally Illuminated Signage

NC-v4 SSc6: Light Pollution Reduction
posted by Jason Garvens on Jan 31, 2019, 11:34 am

I see there is stated...

Last reply: Devendra Chaughule, Oct 17, 2019, 7:44 am

Submit Option 2 for a base building with certification pending??

CI-v4.1 IPc1: Integrative process
posted by Erica Downs on Sep 25, 2019, 2:09 pm

Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building.  The CI project is located in a LEED-registered C&S project, but the...

Last reply: Courtney Royal, Oct 16, 2019, 11:57 pm

Whether or not to include certain existing fixtures within the area of work

CI-v4 WEp1: Indoor water use reduction
posted by Bo White on Jul 15, 2019, 3:17 pm

Our area of work includes portions of the first and second floors of a university library in California. On the first floor, only bathrooms are included. On the second floor, the following space...

Last reply: Bo White, Oct 16, 2019, 7:43 pm

Standard bus stop- weekday vs weekend

NC-v4 LTc5: Access to quality transit
posted by Felicia Ridgeway on Mar 6, 2018, 4:22 pm

Can a standard bus stop count if it is within 1/2 mile of the project entrance, or is  a standard (non rapid) bus stop only allowed to count towards the 1/4 mile distance credit?  

If a...

Last reply: Kristen Magnuson, Oct 16, 2019, 5:59 pm

"Commercial Refrigeration" criteria- details requested

NC-v4 EAc6: Enhanced Refrigerant Management
posted by RDK E&S on Oct 16, 2019, 4:08 pm

Hi, 

I'm working on a manufacturing project that uses refrigeration systems to provide process-related cooling during the manufacturing. What is considered a "commercial refrigeration...

Purchasing Lamps Innovation Credit

NC-v4 INc1: Innovation
posted by Jason Garvens on Jan 19, 2018, 12:25 pm

For the Purchasing Lamps Innovation credit the requirements section states: "Must meet the exemplary performance criteria of the base credit (an average 35 picograms per lumen hour or less)."...

Last reply: Stephanie Graham, Oct 16, 2019, 3:55 pm

Occupant Comfort Survey and Students

Schools-NC-v4 INc1: Innovation
posted by Bryna Dunn on Oct 16, 2019, 3:55 pm

In v4, the innovation credit language states: "The responses must be collected from a representative sample of building occupants making up at least 30% of the total occupants."  In past versions...

Occupant Comfort Survey

NC-v4 INc1: Innovation
posted by Leanne Conrad on Aug 3, 2017, 4:01 pm

Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey? I want to submit the IN credit with the first construction submittal but don't want to have to...

Last reply: Stephanie Graham, Oct 16, 2019, 3:48 pm

Space types and visitors to be surveyed

EBOM-v4 LTc1: Alternative Transportation
posted by Jorge López de Obeso on Oct 16, 2019, 1:53 pm

Hi, in an offices building visitors must be surveyed? The building has sporadic events in common spaces and the visitors rate is irregular. Additionally, the Building guide doesn't address how...