Log in
Forum
Loading...
Topic

Any constraint on the location?

Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection
posted by Yoyo Shek on Mar 14, 2019, 6:27 am

Hi All,

Originally in the Credit language Option 2:

"Financial support must be provided to a nationally or locally recognized...

Last reply: Rachel Nicely, Jun 10, 2019, 12:06 pm

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: Kathryn Owens, Jun 10, 2019, 8:20 am

Material Ingredient Optimization & where to find plans & assessments

CI-v4.1 MRc5: Building product disclosure and optimization - material ingredients
posted by Carina Clark on Jun 7, 2019, 3:55 pm

In looking at the new 4.1, where can I look to determine if a products meets either the Action plan, the Advanced screening & assessment, or the Full assessment?

Additionally, if the...

VCT floor Polish product that is LEED V4 compliant

NC-v4 EQc2: Low emitting materials
posted by Andrew Nelch on Apr 22, 2019, 5:05 pm

We are installing Armstrong Bio Based Tile that requires a polish after install. We are looking for a LEED V4 compliant floor polish product that meets the...

Last reply: Keith Robertson, Jun 7, 2019, 12:47 pm

100 % Non potable power- No Compliance

NC-2009 WEc1: Water Efficient Landscaping
posted by SAMY Chamy on Dec 5, 2018, 9:26 am

Dear All:-

Our project is use 100 % recycled water for irrigation (ETP Treated water) and so it is option 2 - path 1 and we have met the

option 1 50% water reduction by use...

Last reply: debra lombard, Jun 7, 2019, 12:37 pm

Sealant Tape Adhesive Volume?

NC-v4 EQc2: Low emitting materials
posted by Jasmine Abdollahi on Aug 16, 2018, 9:54 pm

Forgive my ignorance here, but how does LEED v4 handle sealant tapes? In this case I'm asking about duct sealant tapes, but it could apply to any other tape used in construction. It seems clear...

Last reply: Martha Norbeck, Jun 7, 2019, 12:12 pm

Open Aircraft Hangar, No HVAC

NC-v4 EAc2: Optimize Energy Performance
posted by Adam Fitzpatrick on Jun 5, 2019, 10:58 am

We are designing an open aircraft hangar in southern Alabama that will not have any HVAC equipment.  How would we go about pursuing Optimize Energy Performance credits?

My initial thought...

Last reply: Adam Fitzpatrick, Jun 7, 2019, 12:05 pm

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6: Interior lighting
posted by Kera Lagios on Jul 15, 2016, 6:27 pm

that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only lighting. It's a little unclear in the LEED Guide,...

Last reply: Maria Porter, Jun 7, 2019, 8:47 am

Water meter installation location

EBOM-v4 WEp1: Indoor water use reduction
posted by Shathiswara Rao on Jun 6, 2019, 9:39 pm

 The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets? or we can fix one...

MRc1 Option 3

NC-v4 MRc1: Building life-cycle impact reduction
posted by Barbara Clarke on Jun 6, 2019, 4:07 pm

We have the calculations sf for our existing exterior...