Log in
Forum
Loading...
Topic

CxA Qualification requirements

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Ryan Younis on Nov 11, 2019, 11:12 pm

Hello, 
i am looking to see if LEED requires any credentials specifically for the...

Last reply: David Hubka, Nov 12, 2019, 2:40 pm

Baseline System- System 5 (Packaged VAV with Reheat)

NC-2009 EAp2: Minimum Energy Performance
posted by Wayne Mc Fall on Nov 12, 2019, 12:06 pm

Hi,

I'm just wondering could anyone tell me where to find the cooling efficiency values of baseline System 5 - Packaged...

Last reply: Marcus Sheffer, Nov 12, 2019, 1:47 pm

Structural composite wood and moisture resistant adhesives- compliance and supporting documentation

NC-v4.1 EQc2: Low-emitting materials
posted by Esther Ma on Nov 12, 2019, 11:34 am

Hello LEED User community,

Does anyone have any information regarding how to show compliance with and document the "moisture resistant adhesives meeting...

Community revitalization program and its compliance with Option 2

Warehouses-NC-v4 LTc3: High Priority Site and Equitable Development
posted by Agata Mozer on Mar 20, 2018, 11:11 am

We are engaged in LEED certification process of the distribution center located in the area which is covered by current community revitalization program. The program constitutes the community...

Last reply: Agata Mozer, Nov 12, 2019, 11:28 am

CAS Number

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Samantha Lee on Nov 11, 2019, 2:17 pm

I have two questions about MRc4- Material Ingredients. Is a CASRN the same thing as CAS Number? Also, has anyone used the CAS number from a SDS as credit compliance for this credit?

Last reply: Tristan Roberts, Nov 12, 2019, 10:32 am

Process or non-process? Kitchen Hood Exhaust and Makeup Air

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Scott on Feb 4, 2015, 2:51 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5555 thumbs up February 4, 2015- 5:18 pm I think I answered this a bit ago in one of these forums. As I recall when the hood is make up air and exhaust without any space conditioning then it is process. When the hood includes some space conditioning that serves the space surrounding the hood then it is not process. Log in or register to post comments Matt Scott Engineer N.E. Fisher & Associates, Inc. LEEDuser Basic Member 18 thumbs up February 5, 2015- 8:55 am So even if the makeup air is heated, it's still considered...

Last reply: Marcus Sheffer, Nov 12, 2019, 8:50 am

which standard to be refered to get the LRV of different wall, ceiling and floor?

CI-v4 EQc6: Interior lighting
posted by Leanne Niu on Nov 5, 2019, 1:58 am

I will submit a project to get this point, but i don't know which standard to be refered for LRV of different materials.

Thanks!

Leanne

Last reply: Kera Lagios, Nov 11, 2019, 8:29 pm

Reduce Parking Footprint

NC-v4 LTc7: Reduced parking footprint
posted by Hadar Farjo on Sep 22, 2016, 3:06 pm

LT Credit : Reduced parking Foot print
Can this credit be achieved if there are no parking spaces provided and we are using existing parking lot for the new building?

Last reply: David Posada, Nov 11, 2019, 12:59 pm

T-shaped Space Alternative?

Pilot-Credits INpc125: Inclusive Design
posted by Kristi Ennis on Nov 8, 2019, 4:31 pm

#1 Physical Access proposes that the size of the turning space be increased to a 6' diameter (in lieu of 5'). Has there been any discussion about the size of an alternative T-shaped turning space...

Last reply: Emily Purcell, Nov 11, 2019, 10:37 am

Group certification- calculating and placing bike racks

CS-v4 LTc6: Bicycle facilities
posted by Barbora Cicvárková on Nov 7, 2019, 10:03 am

Hi all,

we are pursuing group certification for project with 5 separated above ground buildings (section A,B,C,D,E) connected with underground parking garages.

Each section has...

Last reply: Barbora Cicvárková, Nov 11, 2019, 7:20 am