Log in
Forum
Loading...
Topic

Cooling tower cycles

NC-v4 WEc3: Cooling tower water use
posted by Manuel Martin Delgado on Mar 30, 2016, 7:30 am

Hi,

I am a bit confused with the credit requirements for achieving 1 point.
We have already the make-up water parameters and we have calculated the cycles of concentration for each...

Last reply: Zeynep Cakir, Sep 12, 2019, 6:24 am

Solar access

Pilot-Credits SSpc82: Local food production
posted by Reshadee Weerasooriya on Sep 11, 2019, 3:13 am

Hi all,

Could someone please clarify what is the infrastructure requirement meant by "Solar access". We can't find any references to this and it is confusing how to document this part. ...

Last reply: David Posada, Sep 11, 2019, 8:31 pm

Building Envelope Commissioning

NC-v4 EAc1: Enhanced Commissioning
posted by Chris Bennett on Feb 16, 2018, 5:29 pm

Hello All, 

Has anyone gone through the process of building envelope...

Last reply: Scott Bowman, Sep 11, 2019, 8:25 pm

CxA to be an individual

NC-v4 EAp1: Fundamental commissioning and verification
posted by Omar ElRawy on Oct 2, 2018, 5:33 pm

Concerning all projects (either under or above 20,000 sqft), can the...

Last reply: Scott Bowman, Sep 11, 2019, 8:21 pm

Electrical Commissioning Scope

NC-v4 EAp1: Fundamental commissioning and verification
posted by Renee Azerbegi on Sep 24, 2015, 6:25 pm

We have several clients who are implementing LEED v4. While the changes in Fundamental and Enhanced...

Last reply: Scott Bowman, Sep 11, 2019, 8:15 pm

LEED4.1 Multi-attribute optimization- life cycle impact reductions in embodied carbon

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Dionisio Franca on Mar 22, 2019, 3:04 am

Quoted from the 4.1 Beta:

Option 2. Multi-Attribute Optimization (1 point)
Use products that comply with one of the criteria below for 10%, by cost, of the total value of
...

Last reply: David Posada, Sep 11, 2019, 8:01 pm

Concrete bonding agent below slab on grade

NC-v4 EQc2: Low emitting materials
posted by Vandita Mudgal on Sep 10, 2019, 4:35 pm

We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the...

Last reply: Vandita Mudgal, Sep 11, 2019, 1:21 pm

exemplary performance in v6 form

NC-2009 EAc6: Green Power
posted by Elizabeth Eason on Mar 22, 2016, 12:08 pm

Is the exemplary performance point still available? The new form v6 does not have the option for selecting exemplary performance. The ID credits do not have EAc6 as an option in the pull down...

Last reply: emily reese moody, Sep 11, 2019, 1:12 pm

Remove Process Equipment?

NC-v4 EAc7: Green power and carbon offsets
posted by Jasmine A on Sep 11, 2019, 12:37 pm

I'm working on a manufacturing facility that is attempting to achieve this credit. Are process or any other loads eligible to excluded from the total energy consumption for estimates?

Last reply: Marcus Sheffer, Sep 11, 2019, 12:54 pm

Display signage requirements

NC-v4 SSc6: Light Pollution Reduction
posted by Neetika Parmar on May 5, 2019, 3:23 am

Hi 

I have a question regarding the external signage requirement. Our project plans to have a totem signage with digital display. Does this need to meet the requirement as specified by...

Last reply: Bill Swanson, Sep 11, 2019, 11:31 am