Topic | Recent |
---|---|
Providing a clarification narrative?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Tim Connor on Oct 1, 2012, 11:11 am
As part of my review comments I have been asked to provide clarification narratives for several MEP related credits. Notably EAp3 has no required uploads, so I can't upload a narrative... Last reply: Marcus Sheffer, Oct 2, 2012, 9:46 am |
|
Submiting a new credit during a clarificationLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Christopher Sawyer on Sep 26, 2012, 2:57 pm
I did a split review under V2.2 and I'm now in Construciton submittal but the reviewers have asked for clarifications. It seems possible to add a design credit not orginally pursued at this time... Last reply: Scott Bowman, Sep 26, 2012, 3:06 pm |
|
Leed NC 2009- documents to translate in english for reviewsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Nicolas MOLLE on Sep 10, 2012, 12:34 pm
Hello, Last reply: Steve Khouw, Sep 12, 2012, 6:09 am |
|
What happens when you 'skip final design review'?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Valerie Molinski on Aug 20, 2012, 4:57 pm
I've never been in this situation before, and I don't want to hit the button and 'wait and see.' i have a project where we were doing a split submittal. I submitted for preliminary design... Last reply: USGBC National Office (in DC) BG+LU FW, Aug 21, 2012, 10:30 am |
|
Assigned Team Role: Leed v2.2LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Elle Brown on Jul 30, 2012, 9:41 am
How important is it that the person associated with the 'Assigned Team role" in the Claim of Credit Status matches the name on the uploaded credit template Is it necessary for me to go into each... Last reply: Susan Walter, Aug 20, 2012, 8:13 am |
|
LEED for Schools 2007LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Suzanne Allerton on Aug 15, 2012, 12:03 pm
2 part question 1 - we are at the threshold between silver and gold. Is it possible to speak to our reviewer. The credit we need is in the Energy model and only Last reply: Valerie Molinski, Aug 15, 2012, 12:14 pm |
|
Construction Preliminary Review as FinalLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Joseph Greene on Aug 6, 2012, 3:13 pm
We selected the split review process and recently received Construction Preliminary Review comments. We are satisfied with the results of this review and would like to skip the Construction... Last reply: Tristan Roberts, Aug 15, 2012, 12:11 pm |
|
Submit denied design phase credit for construction final reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Udana Ratnayake on May 31, 2012, 1:09 pm
in one of our projects prerequisite IEQp1 minimum indoor air quality performance was denied both in design preliminary review and final review. then we submitted it again after doing the required... Last reply: Tristan Roberts, Jul 1, 2012, 3:39 pm |
|
Revising Contractor LEED documentation (v2.2 project)LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Elle Brown on Jun 29, 2012, 1:38 pm
We are reviewing a project for LEED certification (v 2.2) that was designed and constructed by another firm. There are documentation and template form issues with the Recycled content/Regional... Last reply: Elle Brown, Jun 29, 2012, 2:15 pm |
|
Pursuing additional credits after final certification reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by jim bell on Jun 25, 2012, 11:07 am
We have a project that has received final design and construction review. The project has fallen short of the threshold for Silver. What is the method to pursue additional credits? Do we have... Last reply: TODD REED, Jun 26, 2012, 11:57 am |