EAc1 ASHRAE 90.1-2007 Energy Simulation Model

NC-2009 EAc1: Optimize Energy Performance
posted by Denise Newbould on Mar 16, 2011, 5:13 pm

Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed? Since the engineer on our LEED...

Last reply: Marcus Sheffer, May 8, 2012, 10:24 am

Weather data for sizing runs

NC-2009 EAc1: Optimize Energy Performance
posted by Francesco Passerini on Apr 20, 2012, 12:42 pm

The equipment capacities for the baseline building design shall be based on sizing runs for each orientation (see G3.1.2.2 and G3.1.2.2.1). I am simulating in an Italian locality and I’m using...

Renewable Energy and Green Power

NC-2009 EAc1: Optimize Energy Performance
posted by Joshua Bloom on Apr 13, 2012, 2:38 pm

In EAc1 Related Credits (pg. 260 of BD&C Book) it says that you can mitigate energy use impacts by using...

Last reply: Marcus Sheffer, Apr 13, 2012, 2:48 pm

EAc1 Design Review Question- Seeking Guidance ASAP

NC-2009 EAc1: Optimize Energy Performance
posted by Joshua Bloom on Apr 13, 2012, 2:35 pm

If I submit EAc1 in my design review and it gets sent back as likely approved, can I still have the ability to change some things before I submit again for Construction Review?

Last reply: Marcus Sheffer, Apr 13, 2012, 2:46 pm

Energy Cost

NC-2009 EAc1: Optimize Energy Performance
posted by Mike Decoster on May 25, 2010, 2:28 pm

We are working on a project with a modelled energy savings of 47% when comparing BTU/sf/yr. When we calculate it as LEED requires (in terms of dollars) our building energy efficiency drops to 22...

Last reply: Marcus Sheffer, Apr 11, 2012, 9:32 am

What to do when electricity produces less carbon than gas?

NC-2009 EAc1: Optimize Energy Performance
posted by Raphael Sperry on Apr 6, 2012, 8:03 pm

Hello all,

I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral....

EAp2 option 2 vs EAc1 Option 3

NC-2009 EAc1: Optimize Energy Performance
posted by Carl Sherman on Apr 4, 2012, 3:13 pm

If we use option 2 for EAp2 can we use option 3 for EAc1 or do we need to be consistant throughout?

Last reply: Marcus Sheffer, Apr 4, 2012, 3:51 pm

DES Option 1 or Option 2

NC-2009 EAc1: Optimize Energy Performance
posted by Katherine Ann Resurreccion on Apr 3, 2012, 2:51 am

If...

Virtual vs Scaled CEP modeling for LEED EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by Larry Jones on Mar 2, 2012, 3:27 pm

Hi all,

We are modeling a new construction hospital whose cooling loads are met by 3 onsite 1350 ton chillers. A fourth ‘future’ 1350 ton chiller is added to this plant to provide...

Last reply: Katherine Ann Resurreccion, Apr 2, 2012, 2:18 am

LEED V2- NC A Building Housing a CHP Plant for a Campus DES

NC-2009 EAc1: Optimize Energy Performance
posted by Melissa Crowe on Oct 14, 2011, 6:14 pm

No CHP. I know there have been discussions elsewhere on this forum re: process loads, but our problem seems unique to the building type... must we treat secondary plant equipment for heat rejection...