Are Coco Mats accepted as entryway mats?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Jason Franken on Nov 3, 2022, 4:42 pm
Has anyone had success using coco mats (made from material derived from coconut husks) as the entryway system? I know that... Last reply: Sarah Buffaloe, Jan 3, 2024, 10:36 am |
|
LM-83 and spaces greater than 10,000 SFPilot-Credits EQpc116: Daylight in nonregularly occupied spacesposted by Stephanie Graham on Mar 23, 2021, 12:24 pm
Opening a new comment. Our Project is a large university campus thermal energy plant and the chiller room alone is over 10,000 SF and the largest space in the building. Our daylight... Last reply: Collin Robinson, Jan 3, 2024, 10:02 am |
|
One Tenant- two spaces across a public corridor- can this be certified as one project?CI-v4 MPR2: Must use reasonable LEED boundariesposted by Helen Kessler on Oct 31, 2017, 2:16 pm
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple... Last reply: Dave Hubka, Jan 3, 2024, 8:25 am |
|
Chinese Green Electricity Certificate "GECs"NC-v4.1 EAc5: Renewable energyposted by Josef Andersen on Jan 2, 2024, 4:39 am
Hi! It came to my knowledge that USGBC does not accept Chinese Green Electricity Certificate "GECs". Allthough I have heard that projects have been usning GECs and earned... Last reply: Marcus Sheffer, Jan 2, 2024, 2:55 pm |
|
EPD Stud- Separate products count towards 20+ goal under 1 EPDNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Allison Para on Dec 29, 2023, 9:56 am
Hello LEED Pros, I have a letter and an EPD from a manufacturer, and I want to confirm the letters validity regarding how each seperate product counts as 1 product point under the EPD,... Last reply: Allison Para, Jan 2, 2024, 1:38 pm |
|
No Cooling TowerCS-v4 WEc3: Cooling tower water useposted by Adriana Hansen on Jan 2, 2024, 11:46 am
Regarding the alternative compliance path to the LEED v4 credit Cooling tower water use (BD+C)<https://www.usgbc.org/node/2611780>, a... |
|
No Cooling TowerCS-v4 WEc3: Cooling tower water useposted by Adriana Hansen on Jan 2, 2024, 11:33 am
Regarding the alternative compliance path to the LEED v4 credit Cooling tower water use (BD+C)<https://www.usgbc.org/node/2611780>, a... |
|
100% greenfield site admissibilityNC-v4.1 SSc2: Protect or Restore Habitatposted by Carla Rincon on Feb 6, 2023, 10:06 am
Hello everyone, Can you help me clarify if a 100%... Last reply: Talia Mamayek, Jan 2, 2024, 11:47 am |
|
Fresh Air RequirementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on Nov 28, 2023, 4:10 am
I have an existing self storage warehouse to be certified under LEED v4.1 O+M Existing Buildings. It has no regular occupants and no regularly occupied spaces. Usually the storage spaces... Last reply: Dave Hubka, Jan 2, 2024, 9:24 am |
|
Make Up Air Units Modeling Requirements (System or Process Load)- ASHRAE 90.1-2010NC-v4 EAp2: Minimum Energy Performanceposted by Richard Tran on Dec 26, 2023, 9:05 pm
Hello, I'm currently working on my first Energy Model for a dining hall/domitory on a college campus. Currently I'm having a dillema on if I need to model the Make Up Air Unit as a process... |