Topic | Recent |
---|---|
Walk-in coolers and freezersNC-2009 EAp2: Minimum Energy Performanceposted by Vernon Smith on Nov 1, 2016, 1:13 pm
I am modeling a 35,000 sf cafeteria that has seven walk-in coolers/freezers with total floor area of about 1700 sf. They are in the basement and first floor of the building. In Energy Plus, the... Last reply: Marcus Sheffer, Feb 13, 2024, 10:20 am |
|
Projects with several distinct structuresHospitality-NC-v4 MPR3: Must comply with project size requirementsposted by Manzil Shrestha on Feb 13, 2024, 5:07 am
"Any single... |
|
Low Emissions? for Structural WoodCI-v4.1 EQc2: Low emitting materialsposted by Summer Gorder on Oct 11, 2023, 2:05 pm
We are talking with a Wood manufacturer for CLT and Glulam and we have gone through the painful process of... Last reply: Lauren Breckenridge, Feb 12, 2024, 4:29 pm |
|
DES- VRF mixed Proposed systemRetail-CI-v4 EAc2: Optimize Energy Performanceposted by Lorenzo Giannetti on Feb 12, 2024, 5:47 am
Hi all, I am working on a project where, regarding the heating part of the proposed design, the... |
|
Turf GrassNC-v4 SSc3: Open spaceposted by Vaneeza Javed on Feb 12, 2024, 2:07 am
Is Normal grass consider in Turf Grass or not? |
|
Open Space and Turf GrassNC-v4 SSc3: Open spaceposted by Vaneeza Javed on Feb 12, 2024, 2:01 am
What does leed implies when it mentions Turf grass and why Turf grass does not count as vegetated area? |
|
Alternative Compliance Paths (ACPs)NC-v4 EQp1: Minimum indoor air quality performanceposted by Santiago Avila on Feb 9, 2024, 5:40 am
Hello everyone, I am currently working on a project located in Germany. The ventilation strategy for the apartments will be carried out through continuous exhaust fans located in the... |
|
Certifiying a Historic Building & New ConstructionLEED Rating System Selectionposted by Dominique Dowd on Feb 8, 2024, 5:22 pm
I'm working a v4 BD+C Multifamily project.... |
|
Autocase inputs slightly different than LEED OutputsPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on Aug 7, 2022, 6:05 pm
We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information. I thought it would be good for anyone else... Last reply: Rachael Johnson, Feb 8, 2024, 4:49 pm |
|
No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% ReductionCS-v4.1 WEc3: Optimize Process Water Useposted by Grace Friedhoff on Feb 24, 2022, 3:08 pm
I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no... Last reply: Marelle Davey, Feb 7, 2024, 11:56 am |