Topic | Recent |
---|---|
ERV serving 3 different tenantsCS-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Kristopher Lashley on Jun 12, 2015, 2:22 pm
We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air. Space one has a duct from the ERV directly... Last reply: Dylan Connelly, Jan 23, 2017, 10:10 am |
|
Hand Hygiene- Towel DispensersEBOM-2009 IEQp3: Green Cleaning Policyposted by Jeannie Rueter on Jan 20, 2017, 6:27 pm
USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library. One of the strategies under Hand Hygiene is that "All restrooms will be equipped with hands-free soap... Last reply: Trista Brown, Jan 20, 2017, 6:31 pm |
|
LEED O+M: MultifamilyNC-v4 MPR3: Must comply with project size requirementsposted by Adam Stoker on Nov 28, 2016, 11:31 am
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects? Last reply: Steve Loppnow, Jan 20, 2017, 5:08 pm |
|
Trouble finding comparable projects for recycling ratesCS-2009 MRp1: Storage and Collection of Recyclablesposted by Martin Stowell on Jun 10, 2016, 2:04 pm
I am working on a C&S project and I am trying to figure out the expected volume of recycling for the building. I've contacted local waste haulers but is there somewhere else that i can find... Last reply: Steve Loppnow, Jan 20, 2017, 3:12 pm |
|
LEED Credit Awarded with CommentsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Vicki Rybl on Jan 19, 2017, 4:51 pm
We recently received review comments back for a project and one of the credits was marked as "Awarded", however there are review comments on the credit. I suspect that this was a user error on... Last reply: Marcus Sheffer, Jan 20, 2017, 10:00 am |
|
Copy area in office- acoustical treatmentCI-v4 EQc9: Acoustic performanceposted by Leticia SooHoo on Jul 11, 2016, 2:29 pm
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space. The copy area will have full height walls enclosing the area but... Last reply: Daniel Hicks, Jan 19, 2017, 4:22 pm |
|
carpeting and flooringNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Roger Lewis on Dec 21, 2016, 11:46 am
Is there a LEED standard for carpet properties or hard surface properties that affect the collection or resuspension of dust? Are there LEED standards for vacuum cleaning machines that collect... Last reply: John-David Hutchison, LEED AP BD+C, PMP, Jan 19, 2017, 10:13 am |
|
Community Choice Aggregation (CCA)CS-2009 EAc6: Green Powerposted by Megan White on Oct 26, 2016, 12:52 pm
Do we know if... Last reply: Marcus Sheffer, Jan 19, 2017, 9:27 am |
|
Existing HVAC system efficiencyCI-v4 EAp2: Minimum Energy Performanceposted by Richard Mathews on Oct 11, 2016, 3:02 pm
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit. I know that I've got to model the actual performance of that rooftop unit... Last reply: Marcus Sheffer, Jan 18, 2017, 6:51 pm |
|
Different equipment types or all equipment units in scopeCI-2009 EAp3: Fundamental Refrigerant Managementposted by Edgar Arevalo on Jan 13, 2017, 10:33 am
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled. Do I include all 4 CRAC units (even though they are the same make, model, and use the... Last reply: Ashwini Arun, Jan 18, 2017, 5:50 pm |