Log in
Forum
Loading...
Topic

Current Facilities Requirements and O&M Plan

NC-v4 EAp1: Fundamental commissioning and verification
posted by Chris Bennett on Mar 22, 2019, 12:30 pm

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

Does the information required to be included in...

Last reply: Chris Bennett, Mar 28, 2019, 11:02 am

All equipment tested as part of commissioning?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jill Watkins on Mar 22, 2019, 11:22 am

I am LEED consultant on a convention center renovation/addition and some team members are asking whether or not all equipment needs to be tested in all modes of operation, or if one of each type...

Last reply: David Hubka, Mar 28, 2019, 10:02 am

Core & Shell” version of the “LEED BD+C: Warehouses and Distribution Centers

LEED Rating System Selection
posted by Ricardo Sá on Mar 27, 2019, 1:20 pm

Dear...

Last reply: Michelle Rosenberger, Mar 27, 2019, 3:05 pm

LEED v4.1- Third Party Certifications

NC-v4 EQc2: Low emitting materials
posted by Pablo Jimeno on Mar 26, 2019, 2:26 pm

Hello All,

We are considering adopting LEEDv4.1 requirements for the Low Emitting Materials credit across our projects.

We note that...

Last reply: Tera Bartman, Mar 27, 2019, 2:59 pm

rating system for a manufacturing facility?

LEED Rating System Selection
posted by Gail Napell on Mar 26, 2019, 3:01 pm

Hi all

we're looking to accredit a manufacturing facility with about 85% mfg/ warehouse and  15% offices/ amenity space.  Which rating system is the most applicable?

Last reply: David Hubka, Mar 27, 2019, 1:10 pm

Updated Modeling Manual?

CI-v4 EAp2: Minimum Energy Performance
posted by Deborah Stadler on Mar 27, 2019, 12:23 pm

USGBC has the Advanced Energy Modeling for LEED Technical Manual v2.0 for LEEDv2009, which was helpful.  We cannot find an updated version for v4.  Does anyone know if this exists and where it is...

Last reply: Marcus Sheffer, Mar 27, 2019, 1:01 pm

Master Site with three projects possibly a fourth

LEED Guidance for Campuses and Multiple Buildings
posted by Lou Niles II on Mar 27, 2019, 11:46 am

Hello I am looking for guidance or experience in a phased construction on a Master Site. I have a Master Site in southern California has three Core & Shell projects on it. Lets call them...

Fuel efficient vehicles outside the U.S.

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Kay Rix on May 16, 2011, 10:14 am

We are working on LEED Projects in Germany. Only very few cars we have on our streets are listed by the ACEEE.
Regarding the fuel consumption we think that many cars here in Germany would...

Last reply: Emily Purcell, Mar 27, 2019, 10:01 am

Bicycle racks distance

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on May 28, 2018, 5:41 am

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

- 1 in the basement, but a lift dedicated to...

Last reply: Emily Purcell, Mar 27, 2019, 9:57 am

Baseline System Selection

NC-v4 EAp2: Minimum Energy Performance
posted by Pramod Naik on Mar 26, 2019, 7:51 am

I am working on a LEED for Homes project. The project has...

Last reply: Marcus Sheffer, Mar 27, 2019, 8:54 am