Log in
Forum » LEED Rating System Selection
Topic

Addition to an Existing Building

LEED Rating System Selection
posted by Henrique Mendes on Jul 18, 2013, 10:20 am

Technical Director The Laurentia Project, HPDC LEEDuser Expert 11456 thumbs up July 22, 2013- 9:18 am Right about the 60%. On your energy question, I'd post that to our EBOM EAp2 forum. Log...

Last reply: Tristan Roberts, Jul 22, 2013, 9:18 am

Residential project in Oman LEED NC or LEED for Homes

LEED Rating System Selection
posted by Lise Dannesboe on Jul 2, 2013, 4:12 pm

We would like to certify a new construction residential project in Oman, 5 floors, 11.400 sqm in total, that would be 122 708.579 square feet.
LEED NC is for high-rise residential buildings...

Last reply: Lise Dannesboe, Jul 3, 2013, 10:27 am

Project registered as CS2009 but developer just sold 70%

LEED Rating System Selection
posted by Sonia M. Miranda Palacios on Jun 11, 2013, 10:11 am

Hi all.

I am working in a project that is currently registered as LEED CS 2009. The construction already started (demolition, excavation, sub-bases and 3 underfloor garages have been built...

Last reply: Sonia M. Miranda Palacios, Jun 19, 2013, 8:24 am

CI for retail?

LEED Rating System Selection
posted by Jan Hesse on Jun 18, 2013, 7:10 am

The CI - Reference Guide says under chapter II. that LEED 2009 for Commercial Interiors also addresses retail.

...

Last reply: Jan Hesse, Jun 19, 2013, 2:11 am

LEED Campus vs LEED Schools vs LEED NC

LEED Rating System Selection
posted by Caroline O'Leary on May 16, 2013, 1:10 pm

I'm confused and could use a bit of help. We are in the pre-design phase of a new student center on a higher ed campus that I don't believe has any other LEED certified buildings on it. I am...

Last reply: Tristan Roberts, Jun 18, 2013, 8:49 am

LEED EB or NC?

LEED Rating System Selection
posted by Elke Malleier on May 28, 2013, 7:51 pm

We are building a considerable extension with new production lines to an existing manufacturing plant built in 1984, that has no LEED certification. The client wants to apply for a LEED...

Last reply: Susan Walter, Jun 18, 2013, 8:48 am

LEED CI applicability

LEED Rating System Selection
posted by Esther Izquierdo on Jun 11, 2013, 9:02 am

Hi,

I am working on a commercial project where the new owner is planning a fit-out renewal. The owner will occupy 90% of the space, with 10% being sub-let. The fit-out will occur in the...

Last reply: Tristan Roberts, Jun 18, 2013, 8:40 am

Certification- Factory Building

LEED Rating System Selection
posted by Nowfal Kunju Muhammed on May 13, 2013, 4:00 am

Is it possible to certify an unconditioned factory building (only lighting load)?

Last reply: Tristan Roberts, May 15, 2013, 9:20 pm

LEED CI and EBOM and transfer after building is sold

LEED Rating System Selection
posted by Todd Bundren on May 15, 2013, 5:38 pm

Does the LEED CI and / or...

Last reply: Tristan Roberts, May 15, 2013, 9:19 pm

NC-v2.2 certified project- How to certify a large new addition

LEED Rating System Selection
posted by Michelle Bombeck on May 3, 2013, 4:10 pm

We have a NCv2.2 certified building that is now constructing an addition. This addition was planned years ago and was registered as an NCv2.2 project but was then put on hold. The project has...

Last reply: Tristan Roberts, May 9, 2013, 12:25 pm