Log in
Forum
Loading...
Topic

PC44- where is the "Pilot Credit Feedback Survey"?

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Leticia SooHoo on Mar 29, 2019, 12:53 am

Our project is pursuing LEED v4 EQ44 -

'Provide the registration confirmation email for the Pilot Credit from USGBC and the email confirming completion of the Pilot Credit Feedback Survey...

Last reply: Chloe Bendistis, Mar 29, 2019, 8:40 am

Female Bidets in LEED calculation?

NC-v4 WEp2: Indoor water use reduction
posted by Hieu Huynh on Mar 29, 2019, 4:25 am

Hi LEED experts,

My project has female bidets, which are different from handheld bidet sprays. I would like to ask if LEED takes female bidets into account and includes in the calculation...

Glare-control devices- glazed doors?

CI-v4 EQc7: Daylight
posted by Victoria Watson on Nov 9, 2018, 1:38 am

Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent glazing?

...

Last reply: Ryan Harrington, Mar 28, 2019, 6:00 pm

Comment requiring input of Average factor instead of High or Low

NC-2009 WEc1: Water Efficient Landscaping
posted by Lou Niles II on Mar 28, 2019, 5:15 pm

Hello,

We have received this comment now on a 2nd project where the review team is requiring in the baseline calculations that we input the Average from Table 1 under WEc1...

Airport projects- LEED NC-v4: LT c6 BICYCLE FACILITIES

NC-v4 LTc6: Bicycle facilities
posted by Ricardo Sá on Nov 13, 2018, 11:53 am

Dear All,

we are working in a project of a new airport pursuing LEED certification.

Regarding LT Bicycle facilities:

  1. peak transients are mainly passengers that are not...

Last reply: Alana Cristante, Mar 28, 2019, 2:56 pm

Apply for extension to submission deadline

CS-2009 PIf1: Minimum Program Requirements
posted by Mary Guest on Mar 28, 2019, 1:23 pm

Hi! I was wondering if anyone had experience with submitting a project for review after the deadline of 2 years past of certificate of occupancy.  The team here was not aware of that deadline, so...

Light Pollution Reduction credit threshold

NC-v4 SSc6: Light Pollution Reduction
posted by Francesco Passerini on Dec 20, 2017, 12:10 pm

​Picking the options will now show a point total "1 of 1 points selected". ​Thank you for asking the question.  USGBC does read these forums. Log in or register to post comments ...

Last reply: Bill Swanson, Mar 28, 2019, 1:32 pm

Lighting power in tenant spaces

CS-v4 EAp2: Minimum Energy Performance
posted by Matt Edwards on Mar 11, 2019, 2:19 pm

We have a question about the baseline and proposed lighting for tenant spaces, and more specifically how to input those in the LEED v4 Minimum Energy Performance Calculator v05 spreadsheet.

...

Last reply: Marcus Sheffer, Mar 28, 2019, 1:12 pm

Separation of space requirements if stove is separately vented

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ann Kelly on Mar 27, 2019, 4:40 pm

All,

If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?

...

Water Restoration Credits- Asia

Pilot-Credits WEpc110: Water Restoration Certificates®
posted by Emily Tan on Mar 28, 2019, 10:37 am

I purchased water restoration certificates for an ID+C v4 project through BEF.

I see from BEF's website that the water restoration projects are all in the USA and was wondering if there...